WELL · 42-363-32974 · DISTRICT 7
Cook J.T. A #3
Palo Pinto County · Palo Pinto Co. Reg. (Gas) field · Temp Abandoned · Vertical
Cook J.T. A #3 (API 42-363-32974) is a well in Palo Pinto County operated by Proco Operating CO. Inc., completed September 24, 1984 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued September 1, 1982, permitted to 4,721 ft.
It was permitted by Tad Energy Company and has since transferred to Proco Operating CO. Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Pregnant Shale, Bend.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Tad Energy Company; the EWA schedule now lists a different operator.
Graford, TX · P-5 Y, filed Nov 4, 2025 · 74 permits on file · (940) 682-5954
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proco Operating Co. Inc. |
| Production reports | Proco Operating Co., Inc.through Sep 2020 |
| Latest permit | Tad Energy CompanySep 1, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,721
- total depth, ft
- 1
- permits on file
- Sep 1, 1982
- last permit issued
- Sep 24, 1984
- completed
- 0
- cumulative oil, bbl
- 142K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 24, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cook, J.T. "A" G-8-114227 | Palo Pinto Co. Reg. (Gas) | Proco Operating Co., Inc. | 1 | 0 | 142K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anderson, E. D.Jan 1993 → Jun 2008
- 2Fairway Resources Operating, LLCAug 2008 → Jul 2016
- 3Proco Operating Co., Inc.Aug 2016 → Sep 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 170746-99 | Drill | Tad Energy Company | Oct 25, 1984 | Sep 1, 1982 | Oct 7, 1982 | 4,721 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-114227 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 981 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pregnant Shale | 3,982 | -3,001 |
| BendBEND CONGL. | 4,324 | -3,343 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,184 | 3,194 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 385 | 12.25 | 250 S |
| 4.5 | 4,634 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 17, 1985 | Oct 24, 1984 | — |
| 00 | Jan 14, 1985 | Sep 24, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-32974 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-32974 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36332974, documented in the API reference.