WELL · 42-363-33387 · DISTRICT 7
Pierce R.N. #5
Palo Pinto County · Ringo (Cong.upper) field · Vertical
Pierce R.N. #5 (API 42-363-33387) is a well in Palo Pinto County operated by Western Chief Operating L.L.C., completed November 29, 1984.
The RRC has issued 2 drilling permits between 1984 and 2012, permitted to 3,800 ft.
Completion filings report one formation top, including Conglomerate.
No lease production has been reported under this well’s leases.
Operator of record
Western Chief Operating L.L.C.
Graham, TX · P-5 Y, filed Oct 4, 2025 · 38 permits on file · (940) 550-8708
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Western Chief Operating L.L.C. |
| Production reports | Western Chief Operating, L.L.C.through Apr 2020 |
| Latest permit | Western Chief Operating, L.L.C.Jan 13, 2012 |
- 3,800
- total depth, ft
- 2
- permits on file
- Jan 13, 2012
- last permit issued
- Nov 29, 1984
- completed
- 0
- cumulative oil, bbl
- 6.37K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 29, 1984
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pierce, R. N. G-8-262216 | Palo Pinto County Regular | Western Chief Operating, L.L.C. | 1 | 0 | 6.37K | Nov 2011 – Jul 2026 |
| Pierce, R.N. G-8-116034 | Ringo (Cong.upper) | Western Chief Operating, L.L.C. | 1 | 0 | 0 | Jan 1993 – Nov 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Western Chief Operating, L.L.C.Nov 2011 → Apr 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 731307-99 | Recompletion | Western Chief Operating, L.L.C. | Jan 9, 2012 | Jan 13, 2012 | Aug 21, 2007 | 3,200 |
| 245871-99 | Drill | Western Chief Oil & Gas Company | Apr 1, 1985 | Jul 23, 1984 | — | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-116034 | — | — | — | — |
| — | — G-8-262216 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 971 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Conglomerate | 3,200 | -2,229 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 992 | 996 | Perforated |
| 1,064 | 1,068 | Perforated |
| 3,221 | 3,225 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 115 | 12.25 | 75 S |
| 4.5 | 3,617 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 17, 2012 | Jan 16, 2012 | — |
| 00 | May 10, 1985 | Feb 11, 1985 | — |
| 00 | May 1, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-33387 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-33387 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36333387, documented in the API reference.