WELL · 42-363-33610 · DISTRICT 7
Long C.B. #8
Palo Pinto County · C.B. Long (Ellenburger) field · Vertical
Long C.B. #8 (API 42-363-33610) is a well in Palo Pinto County operated by Pittencrieff America Inc., completed September 8, 1985.
The RRC has issued 2 drilling permits between 1985 and 1992, permitted to 4,150 ft.
Completion filings report 2 formation tops, including Marble Falls, Dolomite-Limestone.
No lease production has been reported under this well’s leases.
Operator of record
Abilene, TX · P-5 Y, filed Aug 2, 2002 · 111 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pittencrieff America Inc. |
| Production reports | Nordan Oil & Gas Corporationthrough Jul 2006 |
| Latest permit | Pittencrieff America, Inc.Mar 17, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,150
- total depth, ft
- 2
- permits on file
- Mar 17, 1992
- last permit issued
- Sep 8, 1985
- completed
- 0
- cumulative oil, bbl
- 188K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 8, 1985
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Long, C.B. G-8-141089 | C.B. Long, (Marble Falls) | Bluestem Resources LLC | 1 | 0 | 188K | Jan 1993 – Jul 2026 |
| Long, C.B. O-8-23116 | C.B. Long (Ellenburger) | Pittencrieff America, Inc. | 1 | 0 | 0 | Jan 1993 – Dec 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pittencrieff America, Inc.Jan 1993 → Apr 1998
- 2Nordan Oil & Gas CorporationMay 1998 → Jul 2006
- 3S. P. Penntex Energy, L.P.Jun 1998 → May 2003
- 4Penntex Resources, L.P.Jun 2003 → Sep 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 397176-99 | Recompletion | Pittencrieff America, Inc. | Mar 3, 1992 | Mar 17, 1992 | Jun 11, 1990 | 3,775 |
| 281053-99 | Drill | Discovery Exploration Corp. | Aug 5, 1985 | Jul 25, 1985 | — | 4,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-141089 | — | — | — | — |
| — | — O-8-23116 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 976 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 3,314 | -2,338 |
| Dolomite-Limestone | 3,820 | -2,844 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,312 | 3,330 | Perforated |
| 3,808 | 3,810 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 211 | 12.25 | 130 S |
| 5.5 | 3,826 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1992 | Mar 2, 1992 | Yes |
| 00 | Apr 14, 1992 | — | — |
| 00 | Nov 14, 1985 | Oct 17, 1985 | Yes |
| 00 | Nov 8, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-33610 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-33610 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36333610, documented in the API reference.