WELL · 42-363-33771 · DISTRICT 7
Stephens C #2
Palo Pinto County · Palo Pinto Co. Reg. (Gas) field · Vertical
Stephens C #2 (API 42-363-33771) is a well in Palo Pinto County operated by Stephens Morris, completed March 14, 1987.
The RRC has issued 2 drilling permits between 1986 and 1992, permitted to 5,000 ft.
Completion filings report 3 formation tops, including Palo Pinto, Atoka, Marble Falls.
No lease production has been reported under this well’s leases.
Operator of record
Graham, TX · P-5 Y, filed Aug 5, 1995 · 63 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stephens Morris |
| Production reports | WB Mullin Operating LLCthrough Apr 2026 |
| Latest permit | Stephens, MorrisDec 2, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 2
- permits on file
- Dec 2, 1992
- last permit issued
- Mar 14, 1987
- completed
- 0
- cumulative oil, bbl
- 149K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 14, 1987
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stephens "C" G-8-144239 | Texas-57 (Strawn 2400) | WB Mullin Operating LLC | 1 | 0 | 149K | Jan 1993 – Jul 2026 |
| Stephens "C" G-8-123708 | Palo Pinto Co. Reg. (Gas) | Stephens, Morris | 1 | 0 | 0 | Jan 1993 – Jun 1993 |
Gas, mcf lease total
Last 12 months 219 · prior 12 343(-36%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stephens, MorrisJan 1993 → May 1996
- 2Stephens Energy Corp.Jun 1996 → Dec 2021
- 3WB Mullin Operating LLCJun 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 406522-99 | Recompletion | Stephens, Morris | Nov 24, 1992 | Dec 2, 1992 | Dec 31, 1992 | 4,248 |
| 322333-99 | Drill | Stephens, Morris | Oct 27, 1986 | Oct 30, 1986 | — | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-123708 | — | — | — | — |
| — | — G-8-144239 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,321 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LIME | 610 | 711 |
| Atoka | 3,714 | -2,393 |
| Marble FallsMARBLE FALLS LIME | 4,172 | -2,851 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,459 | 2,466 | Perforated |
| 3,880 | 3,886 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 263 | 12.25 | 250 S |
| 4.5 | 4,021 | 7.875 | 310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 1993 | Feb 8, 1993 | Yes |
| 00 | Mar 11, 1993 | — | Yes |
| 00 | Apr 15, 1987 | Apr 6, 1987 | Yes |
| 00 | Apr 14, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-33771 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-33771 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36333771, documented in the API reference.