WELL · 42-363-34113 · DISTRICT 7
J. J. McClure #1
Palo Pinto County · Vertical
J. J. Mcclure #1 (API 42-363-34113) is a permitted well in Palo Pinto County filed by Gardner Production, LLC; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1991 and 2012, permitted to 4,800 ft.
Completion filings report 4 formation tops, including Strawn, Big Saline, Atoka, Marble Falls.
Operator of record
Decatur, TX · P-5 Y, filed Feb 3, 2023 · 7 permits on file · (940) 393-6655
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Petrobal Omega 1, LLCthrough Jul 2018 |
| Latest permit | Gardner Production, LLCJan 24, 2012 |
- 4,800
- total depth, ft
- 2
- permits on file
- Jan 24, 2012
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 26.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McClure, J.J. G-8-140912 | Palo Pinto Co. Reg. (Gas) | Eagleridge Operating, LLC | 1 | 0 | 26.8K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Scully and Smith Oil CorporationJan 1993 → May 1994
- 2Delaney Oil and Gas CompanyJun 1994 → Feb 1995
- 3DMR Operating, Inc.Mar 1995 → Aug 2005
- 4Three B CorporationSep 2005 → Nov 2005
- 5Tracer Operating, Inc.Apr 2007 → Apr 2008
- 6Veritas Energy, LLCApr 2012 → May 2014
- 7Brigadier Operating, LLCJun 2014 → May 2017
- 8Petrobal Omega 1, LLCDec 2017 → Jul 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 731766-99 | Recompletion | Gardner Production, LLC | Jan 17, 2012 | Jan 24, 2012 | — | 2,500 |
| 393733-99 | Drill | Scully and Smith Oil Corporation | Nov 25, 1991 | Nov 25, 1991 | Nov 30, 1991 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-140912 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 968 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnSTRAWN SANDS | 1,575 | -607 |
| Big Saline | 3,572 | -2,604 |
| AtokaATOKA CONGLOMERATE | 3,850 | -2,882 |
| Marble Falls | 4,215 | -3,247 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,220 | 4,230 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 213 | 12.25 | 150 S |
| 4.5 | 4,350 | 7.875 | 328 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 14, 1992 | Mar 19, 1992 | Yes |
| 00 | Mar 26, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34113 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34113 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334113, documented in the API reference.