WELL · 42-363-34419 · DISTRICT 7
Firewater #1
Palo Pinto County · Mineral Wells North (Big Saline) field · Vertical
Firewater #1 (API 42-363-34419) is a plugged well in Palo Pinto County, plugged September 16, 2025, last operated by Hilltop Petroleum LLC.
The RRC has issued one drilling permit, issued June 12, 1995, permitted to 4,800 ft.
It was permitted by Dallas Production, Inc. and has since transferred to Hilltop Petroleum LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pregnant Shale, Big Saline, Marble Falls.
Operator of record
Permitted by Dallas Production, Inc.; the EWA schedule now lists a different operator.
Weatherford, TX · P-5 Y, filed Dec 4, 2025 · (817) 629-2800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilltop Petroleum LLC |
| Production reports | Dallas Production, Inc.through Oct 2015 |
| Latest permit | Dallas Production, Inc.Jun 12, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,800
- total depth, ft
- 1
- permits on file
- Jun 12, 1995
- last permit issued
- Aug 21, 1995
- completed
- 0
- cumulative oil, bbl
- 567K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1995 THROUGH Sep 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 21, 1995
- Shut in
- —
- Plugged
- Sep 16, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Firewater G-8-156190 | Mineral Wells,north (Big Saline) | Hilltop Petroleum LLC | 1 | 0 | 567K | Aug 1995 – Sep 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dallas Production, Inc.Oct 1995 → Oct 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 436782-99 | Drill | Dallas Production, Inc. | Jun 12, 1995 | Jun 12, 1995 | Jul 31, 1995 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-156190 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,113 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pregnant Shale | 3,613 | -2,500 |
| Big SalineBIG SALINE CONGL | 4,122 | -3,009 |
| Marble Falls | 4,716 | -3,603 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,405 | 4,421 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 369 | 12.25 | 220 S |
| 5.5 | 4,800 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 1996 | Dec 21, 1995 | — |
| 00 | Jan 11, 1996 | Oct 4, 1995 | Yes |
| 00 | Dec 11, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34419 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34419 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334419, documented in the API reference.