WELL · 42-363-34464 · DISTRICT 7

Mitchell #2

Y

Palo Pinto County · Chick Bend (Congl.) field · Producing  · Vertical

Mitchell #2 (API 42-363-34464) is a well in Palo Pinto County operated by J-Tec Production LLC, completed November 17, 1995 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1995 and 1996, permitted to 4,500 ft.

It was permitted by Eratz Investments Inc. and has since transferred to J-Tec Production LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Strawn, Marble Falls.

No lease production has been reported under this well’s leases.

Operator of record

J-Tec Production LLC

Permitted by Eratz Investments Inc.; the EWA schedule now lists a different operator.

Mineral Wells, TX · P-5 Y, filed Feb 4, 2026 · (940) 353-8046

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ-Tec Production LLC
Production reportsJ-Tec Production, LLCthrough Apr 2026
Latest permitEratz Investments Inc.Aug 29, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
2
permits on file
Aug 29, 1996
last permit issued
Nov 17, 1995
completed
0
cumulative oil, bbl
184K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 17, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mitchell G-8-158425Palo Pinto Co. Reg. (Gas)J-Tec Production, LLC10184KNov 1995 – Jul 2026

Gas, mcf lease total

Last 12 months 724 · prior 12 861(-16%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Eratz Investments Inc.Dec 1995 → Mar 2005
  2. 2Telesis Operating Co., Inc.May 2005 → Jul 2008
  3. 3Vantage Fort Worth Energy LLCNov 2008 → Jul 2009
  4. 4Borderline Operating Corp.Dec 2013 → Aug 2015
  5. 5Tower Resources IncSep 2015 → Sep 2015
  6. 6Cornerstone O&G Operations, LLCOct 2015 → Nov 2016
  7. 7Box Hill Operating, Inc.Dec 2016 → Nov 2017
  8. 8Attis Operating Inc.Dec 2017 → Mar 2020
  9. 9J-Tec Production, LLCApr 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
452052-99Field transferEratz Investments Inc.Aug 29, 1996Aug 29, 1996—4,500
439317-99DrillEratz Investments Inc.Aug 25, 1995Sep 13, 1995Oct 17, 19954,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-158425————

Formation tops

As filed on W-2/G-1. Subsea from 1,061 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn2,080-1,019
Marble Falls4,135-3,074

Perforations

Perforated and open-hole intervals.

FromToType
4,1874,190Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62541912.25—
4.54,2257.875425 S
4.54,2557.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 29, 1996Sep 6, 1996—
00Jul 8, 1996Mar 22, 1996Yes
00Jun 12, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334464, documented in the API reference.