WELL · 42-363-34628 · DISTRICT 7
Long, C. B. "73" #3
Palo Pinto County · Vertical
Long, C. B. "73" #3 (API 42-363-34628) is a plugged well in Palo Pinto County, plugged June 5, 1997, last operated by Cumming Company, Inc. The.
The RRC has issued 2 drilling permits between 1997 and 2006, permitted to 6,000 ft.
Completion filings report 4 formation tops, including Atoka, Marble Falls, Barnett, Ellenburger.
It holds an active disposal or injection permit.
Operator of record
Fort Worth, TX · P-5 Y, filed Jan 4, 2026 · 410 permits on file · (817) 475-0166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Cumming Company, Inc. TheSep 5, 2006 |
- 6,000
- total depth, ft
- 2
- permits on file
- Sep 5, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jun 5, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Long, C. B. "73" G-8-230424 | Cosco (Conglomerate) | North Texas Plugging, LLC | 1 | 0 | 0 | Apr 2007 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 625327-99 | Reenter | Cumming Company, Inc. The | Aug 31, 2006 | Sep 5, 2006 | Sep 7, 2006 | 6,000 |
| 458695-99 | Drill | Cumming Company, Inc. The | Feb 14, 1997 | Feb 14, 1997 | Mar 13, 1997 | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-230424 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,297 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| AtokaATOKA MARKER | 3,790 | -2,493 |
| Marble Falls | 4,240 | -2,943 |
| BarnettBARNETT SHALE | 4,462 | -3,165 |
| Ellenburger | 4,610 | -3,313 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,140 | 5,480 | Perforated |
| 5,498 | 5,513 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 165 | 12.25 | 150 S |
| 5.5 | 5,498 | 7.875 | 305 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 14, 2007 | Jul 31, 2007 | — |
| 00 | Oct 30, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34628 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34628 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 650K
- bbl, all reported
- Nov 2021
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000096782 | W-14 Disposal | Active | 6,000 | 2,300 | 4,600–5,600 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334628, documented in the API reference.