WELL · 42-363-34722 · DISTRICT 7
Long Ranch #32
Palo Pinto County · Strawn NW. (Marble Falls) field · Vertical
Long Ranch #32 (API 42-363-34722) is a plugged well in Palo Pinto County, plugged June 29, 2023, last operated by Stephens & Johnson Operating CO..
The RRC has issued 4 drilling permits between 1997 and 2008, permitted to 4,000 ft.
Completion filings report 6 formation tops, including Burleson Strawn, Bs Congl. No. 3, Bs Congl. No. 4, Bs Congl. No. 5.
Its 3 leases have reported 584K barrels of oil and 2.08M mcf of gas since July 1996, last reporting in July 2026. The leases carry 18 wells, so these are lease totals, not this well alone.
Operator of record
Stephens & Johnson Operating Co.
Wichita Falls, TX · P-5 Y, filed May 4, 2026 · 360 permits on file · (940) 781-1977
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stephens & Johnson Operating Co. |
| Production reports | Stephens & Johnson Operating Co.through Dec 2018 |
| Latest permit | Stephens & Johnson Operating Co.Oct 1, 2008 |
- 4,000
- total depth, ft
- 4
- permits on file
- Oct 1, 2008
- last permit issued
- Jun 10, 2003
- completed
- 584K
- cumulative oil, bbl
- 2.08M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 10, 2003
- Shut in
- —
- Plugged
- Jun 29, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 18 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Long Ranch O-8-27887 | Strawn, NW. (Marble Falls) | Stephens & Johnson Operating Co. | 16 | 584K | 1.96M | Jul 1996 – Jul 2026 |
| Long Ranch G-8-243306 | Burleson (Strawn) | Stephens & Johnson Operating Co. | 1 | 0 | 75.6K | Mar 2008 – Jun 2023 |
| Long Ranch G-8-177591 | Burleson (Strawn) | Stephens & Johnson Operating Co. | 1 | 0 | 40.6K | Apr 2000 – Jul 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stephens & Johnson Operating Co.Jul 1996 → Dec 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 671256-99 | Reclass | Stephens & Johnson Operating Co. | Sep 16, 2008 | Oct 1, 2008 | Mar 6, 2008 | 3,000 |
| 534043-99 | Recompletion | Stephens & Johnson Operating Co. | Jul 11, 2003 | Jul 11, 2003 | May 21, 2003 | 4,000 |
| 495640-99 | Recompletion | Stephens & Johnson Operating Co. | May 30, 2000 | Jun 5, 2000 | Apr 25, 2000 | 3,000 |
| 469552-99 | Drill | Stephens & Johnson Operating Co. | Oct 31, 1997 | Oct 31, 1997 | Nov 10, 1997 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-177591 | — | — | — | — |
| — | — G-8-243306 | — | — | — | — |
| — | — O-8-27887 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,046 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Burleson Strawn | 1,700 | -654 |
| BS Congl. No. 3 | 3,288 | -2,242 |
| BS Congl. No. 4 | 3,362 | -2,316 |
| BS Congl. No. 5 | 3,462 | -2,416 |
| BS Congl. No. 6 | 3,540 | -2,494 |
| BS Congl. No. 7 | 3,560 | -2,514 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,984 | 1,990 | Perforated |
| 1,997 | 2,010 | Perforated |
| 2,033 | 2,042 | Perforated |
| 3,334 | 3,338 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 244 | 12.25 | 175 S |
| 5.5 | 3,676 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 26, 2009 | Oct 6, 2008 | Yes |
| 00 | Dec 30, 2008 | — | — |
| 00 | Oct 28, 2003 | Jul 18, 2003 | — |
| 00 | Aug 4, 2000 | Jun 19, 2000 | Yes |
| 00 | Jul 13, 2000 | — | — |
| 00 | Mar 13, 1998 | Jan 21, 1998 | Yes |
| 00 | Mar 6, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34722 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34722 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 160K
- bbl, all reported
- May 2008
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000093015 | H-1 Injection | Plugged Jul 18, 2023 | 1,000 | 1,667 | 3,334–3,338 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334722, documented in the API reference.