WELL · 42-363-34736 · DISTRICT 7
Carter 44 #1D
Palo Pinto County · Palo Pinto County Regular field · Injection · Vertical
Carter 44 #1D (API 42-363-34736) is a well in Palo Pinto County operated by Tracer Operating Inc., completed September 4, 1998 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued December 15, 1997, permitted to 1,350 ft.
It was permitted by Eratz Investments Inc. and has since transferred to Tracer Operating Inc. on the wellbore schedule.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 74 barrels injected in the 12 months reported through May 2026.
Operator of record
Permitted by Eratz Investments Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Jul 4, 2026 · 81 permits on file · (940) 549-4683
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tracer Operating Inc. |
| Production reports | none |
| Latest permit | Eratz Investments Inc.Dec 15, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,350
- total depth, ft
- 1
- permits on file
- Dec 15, 1997
- last permit issued
- Sep 4, 1998
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 4, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carter 44 O-8-28521 | Palo Pinto County Regular | Tracer Operating, Inc. | 1 | 0 | 0 | Sep 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 471218-99 | Drill | Eratz Investments Inc. | Dec 15, 1997 | Dec 15, 1997 | Feb 26, 1998 | 1,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28521 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 732 | 1,018 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 11 | 90 S |
| 4.5 | 1,352 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 19, 1998 | Sep 18, 1998 | Yes |
| 00 | Sep 30, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34736 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34736 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 74
- bbl, last 12 reported months
- 144K
- bbl, all reported
- May 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000087183 | H-1 Injection | Active | 500 | 350 | 700–1,280 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 74 · prior 12 74(+0%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334736, documented in the API reference.