WELL · 42-363-34750 · DISTRICT 7

Wheeler #1

Plugged

Palo Pinto County · Strawn NW. (Marble Falls) field  · Vertical

Wheeler #1 (API 42-363-34750) is a plugged well in Palo Pinto County, plugged April 1, 2013, last operated by Palo Pinto Oil & Gas Corporation.

The RRC has issued one drilling permit, issued March 10, 1998, permitted to 4,000 ft.

It was permitted by Jeb Operating CO., Inc. and has since transferred to Palo Pinto Oil & Gas Corporation on the wellbore schedule.

Completion filings report one formation top, including Big Saline.

Operator of record

Palo Pinto Oil & Gas Corporation

Permitted by Jeb Operating Co., Inc.; the EWA schedule now lists a different operator.

Mineral Wells, TX · P-5 Y, filed Aug 7, 2015 · (817) 880-3612

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePalo Pinto Oil & Gas Corporation
Production reportsYeager Energythrough Jun 2003
Latest permitJeb Operating Co., Inc.Mar 10, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Mar 10, 1998
last permit issued
Sep 24, 1998
completed
0
cumulative oil, bbl
2.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Mar 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 24, 1998
Shut in
—
Plugged
Apr 1, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wheeler G-8-169692Strawn, NW. (Marble Falls)Palo Pinto Oil & Gas Corporation102.6KMar 1998 – Mar 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jeb Operating Co., Inc.Aug 1998 → Mar 1999
  2. 2Yeager EnergyMay 1999 → Jun 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
474191-99DrillJeb Operating Co., Inc.Mar 9, 1998Mar 10, 1998Mar 19, 19984,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-169692————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Big Saline3,174

Perforations

Perforated and open-hole intervals.

FromToType
3,1743,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62534812.25215 S
4.53,4007.875130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 10, 1999Feb 22, 1999—
00Sep 22, 1998Aug 24, 1998Yes
00Sep 9, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334750, documented in the API reference.