WELL · 42-363-34765 · DISTRICT 7

Stuart 54 #4C

Y

Palo Pinto County · Double -F- (Strawn) field · Shut IN  · Vertical

Stuart 54 #4C (API 42-363-34765) is a well in Palo Pinto County operated by J-Tec Operating LLC, completed May 30, 1998 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued April 30, 1998, permitted to 1,900 ft.

It was permitted by Four Square Production, L.L.C. and has since transferred to J-Tec Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Double "F" Strawn.

Its lease has reported 30.4K barrels of oil and 190K mcf of gas since March 1998, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

J-Tec Operating LLC

Permitted by Four Square Production, L.L.C.; the EWA schedule now lists a different operator.

Mineral Wells, TX · P-5 Y, filed Feb 4, 2026 · (940) 353-8046

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ-Tec Operating LLC
Production reportsJ-Tec Operating, LLCthrough Jul 2024
Latest permitFour Square Production, L.L.C.Apr 30, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,900
total depth, ft
1
permits on file
Apr 30, 1998
last permit issued
May 30, 1998
completed
30.4K
cumulative oil, bbl
190K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 30, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stuart "54" O-8-28423Double -F- (Strawn)J-Tec Operating, LLC530.4K190KMar 1998 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 289(-100%)

050100150202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 1(-100%)

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Four Square Production, L.L.C.Mar 1998 → Aug 2004
  2. 2Chalker Energy Management,llcSep 2004 → Mar 2006
  3. 3Chalker Energy Management Ii,llcApr 2006 → Nov 2006
  4. 4Tempo Resources GP, LLCJan 2007 → Mar 2013
  5. 5Dallas Production, Inc.Sep 2013 → Sep 2013
  6. 6J-Tec Operating, LLCDec 2019 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
475555-99DrillFour Square Production, L.L.C.Apr 22, 1998Apr 30, 1998May 5, 19981,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28423————

Formation tops

As filed on W-2/G-1. Subsea from 1,325 ft elevation.Download CSV →

FormationMD ftSubsea
Double "F" Strawn1,612-287

Perforations

Perforated and open-hole intervals.

FromToType
1,6101,658Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,8017.875305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 1998Jun 8, 1998Yes
00Jul 1, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334765, documented in the API reference.