WELL · 42-363-34818 · DISTRICT 7
Reagan #5011
Palo Pinto County · Wildcat field · Vertical
Reagan #5011 (API 42-363-34818) is a well in Palo Pinto County operated by Fossil Operating Inc., completed March 2, 1999.
The RRC has issued 2 drilling permits between 1999 and 2000, permitted to 4,200 ft.
No lease production has been reported under this well’s leases.
Operator of record
Dallas, TX · P-5 Y, filed Oct 5, 2018 · 92 permits on file · (972) 681-8047
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fossil Operating Inc. |
| Production reports | J-Tec Production, LLCthrough Apr 2026 |
| Latest permit | Fossil Operating, Inc.Mar 31, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,200
- total depth, ft
- 2
- permits on file
- Mar 31, 2000
- last permit issued
- Mar 2, 1999
- completed
- 0
- cumulative oil, bbl
- 37.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 2, 1999
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Reagan G-8-176357 | Costello, NW. (4000) | J-Tec Production, LLC | 1 | 0 | 37.6K | Mar 2000 – Jul 2026 |
| Reagan G-8-174026 | Wildcat | Fossil Operating, Inc. | 1 | 0 | 0 | Mar 1999 – Mar 2000 |
Gas, mcf lease total
Last 12 months 244 · prior 12 257(-5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fossil Operating, Inc.Mar 2000 → May 2010
- 2Borderline Operating Corp.Jun 2010 → Aug 2015
- 3Tower Resources IncSep 2015 → Nov 2016
- 4Box Hill Operating, Inc.Dec 2016 → Nov 2017
- 5Attis Operating Inc.Dec 2017 → Mar 2020
- 6J-Tec Production, LLCApr 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 493673-99 | Recompletion | Fossil Operating, Inc. | Feb 10, 1999 | Mar 31, 2000 | Feb 21, 1999 | 4,200 |
| 482612-99 | Drill | Fossil Operating, Inc. | Feb 10, 1999 | Feb 10, 1999 | Feb 21, 1999 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-174026 | — | — | — | — |
| — | — G-8-176357 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,874 | 3,880 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 201 | 12.25 | 145 S |
| 4.5 | 4,176 | 7.875 | 210 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 25, 2001 | Mar 8, 2000 | — |
| 00 | Apr 7, 2000 | — | — |
| 00 | Sep 24, 1999 | Aug 23, 1999 | Yes |
| 00 | Sep 3, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34818 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34818 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334818, documented in the API reference.