WELL · 42-363-34822 · DISTRICT 7

Willingham W #W 2

Y

Palo Pinto County · Palo Pinto Co. Reg. (Gas) field · Temp Abandoned  · Vertical

Willingham W #W 2 (API 42-363-34822) is a well in Palo Pinto County operated by Eagleridge Operating LLC, completed December 9, 2014 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued March 11, 1999, permitted to 4,900 ft.

It was permitted by Herring, Ray and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Palo Pinto, Village Bend, Strawn, Strawnsand.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Eagleridge Operating LLC

Permitted by Herring, Ray; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 4, 2026 · 129 permits on file · (855) 820-6008

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsWX Company LLCthrough Nov 2010
Latest permitHerring, RayMar 11, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
1
permits on file
Mar 11, 1999
last permit issued
Dec 9, 2014
completed
0
cumulative oil, bbl
82K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 9, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Willingham W G-8-172574Palo Pinto Co. Reg. (Gas)Eagleridge Operating, LLC1082KApr 1999 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Herring, RayApr 1999 → Oct 2006
  2. 2WX Company LLCNov 2006 → Nov 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
483172-99DrillHerring, RayMar 9, 1999Mar 11, 1999Mar 17, 19994,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-172574————

Formation tops

As filed on W-2/G-1. Subsea from 1,084 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto585499
Village Bend1,227-143
Strawn2,258-1,174
Strawnsand2,258-1,174

Perforations

Perforated and open-hole intervals.

FromToType
2,2582,264Perforated
2,4102,600Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517712.25115 S
4.52,4107.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 2015May 5, 2015—
00May 18, 1999Apr 16, 1999Yes
00Apr 29, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
97.3K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111039H-1 InjectionActive5,0001,2052,410–2,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334822, documented in the API reference.