WELL · 42-363-34917 · DISTRICT 7

Hart Ranch 36 #2

Y

Palo Pinto County · Cumming (Conglomerate) field · Temp Abandoned  · Vertical

Hart Ranch 36 #2 (API 42-363-34917) is a well in Palo Pinto County operated by Mogul Resources LLC, completed August 14, 2013 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued June 9, 2000, permitted to 4,999 ft.

It was permitted by Kokomo Energy, Inc. and has since transferred to Mogul Resources LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Caddo, Big Saline, Atoka, Marble Falls.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Mogul Resources LLC

Permitted by Kokomo Energy, Inc.; the EWA schedule now lists a different operator.

Cisco, TX · P-5 Y, filed Mar 4, 2026 · (254) 631-1404

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMogul Resources LLC
Production reportsMogul Resources, LLCthrough Oct 2024
Latest permitKokomo Energy, Inc.Jun 9, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
1
permits on file
Jun 9, 2000
last permit issued
Aug 14, 2013
completed
0
cumulative oil, bbl
465K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 14, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hart Ranch 36 G-8-178799Cumming (Conglomerate)Mogul Resources, LLC10465KJul 2000 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 325(-100%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kokomo Energy, Inc.Jul 2000 → Dec 2002
  2. 2Marjac Oil Company, Inc.Jan 2003 → Mar 2013
  3. 3Tracer Operating, Inc.Apr 2013 → Feb 2014
  4. 4Mogul Resources, LLCDec 2019 → Oct 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495994-99DrillKokomo Energy, Inc.Jun 9, 2000Jun 9, 2000Jun 23, 20004,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-178799————

Formation tops

As filed on W-2/G-1. Subsea from 1,318 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,212-1,894
Caddo3,224-1,906
Big Saline3,605-2,287
AtokaATOKA CONGLOMERATES3,810-2,492
Marble Falls4,054-2,736

Perforations

Perforated and open-hole intervals.

FromToType
3,2243,257Perforated
3,2243,257Open hole
3,8913,901Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62528412.25170 S
4.54,1377.875130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 27, 2021Sep 30, 2020—
00Apr 10, 2014Jan 20, 2014—
00Nov 8, 2000Aug 30, 2000Yes
00Oct 10, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
502
bbl, all reported
Nov 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000109111W-14 DisposalActive1,0001,0003,224–3,257

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334917, documented in the API reference.