WELL · 42-363-35530 · DISTRICT 7
Nash-Murphy Unit #1
Palo Pinto County · Graford N. (Ellenburger) field · Vertical
Nash-Murphy Unit #1 (API 42-363-35530) is a plugged well in Palo Pinto County, plugged February 24, 2017, last operated by Borderline Operating Corp..
The RRC has issued one drilling permit (amended once), issued April 12, 2006, permitted to 4,999 ft.
It was permitted by Proco Operating CO., Inc. and has since transferred to Borderline Operating Corp. on the wellbore schedule.
Completion filings report 3 formation tops, including Marble Falls, Barnett, Ellenburger.
Its lease has reported 468 barrels of oil and 52.7K mcf of gas since July 2007, last reporting in April 2017.
Operator of record
Permitted by Proco Operating Co., Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Dec 4, 2025 · 98 permits on file · (940) 550-4900
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Borderline Operating Corp. |
| Production reports | Proco Operating Co., Inc.through Jun 2010 |
| Latest permit | Proco Operating Co., Inc.Apr 12, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 2
- permits on file
- Apr 12, 2006
- last permit issued
- Jun 27, 2007
- completed
- 468
- cumulative oil, bbl
- 52.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2007 THROUGH Apr 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 27, 2007
- Shut in
- —
- Plugged
- Feb 24, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nash-Murphy Unit O-8-29993 | Graford, N. (Ellenburger) | Borderline Operating Corp. | 1 | 468 | 52.7K | Jul 2007 – Apr 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Proco Operating Co., Inc.Jul 2007 → Nov 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 617378-98 | Drill | Proco Operating Co., Inc. | May 29, 2007 | Apr 12, 2006 | Jun 27, 2007 | 4,999 |
| 617378-99 | Drill | Proco Operating Co., Inc. | Apr 11, 2006 | Apr 12, 2006 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29993 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 941 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 4,290 | -3,349 |
| BarnettBARNETT SHALE | 4,642 | -3,701 |
| EllenburgerELLENBERGER | 4,797 | -3,856 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,806 | 4,812 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 215 | 12.25 | 175 S |
| 4.5 | 4,963 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 7, 2008 | Sep 12, 2007 | Yes |
| 00 | Jan 30, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-35530 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-35530 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36335530, documented in the API reference.