WELL · 42-363-35869 · DISTRICT 9
Clark Grahame #2
Palo Pinto County · Newark East (Barnett Shale) field · Vertical
Clark Grahame #2 (API 42-363-35869) is a plugged well in Palo Pinto County, plugged July 6, 2023, last operated by Palo Pinto Bond Company LLC.
The RRC has issued one drilling permit (amended once), issued October 21, 2008, permitted to 4,999 ft.
It was permitted by Upham Oil & Gas Company and has since transferred to Palo Pinto Bond Company LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Marble Falls, Barnett, Ellenburger.
Operator of record
Permitted by Upham Oil & Gas Company; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Jun 4, 2026 · (254) 485-3118
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Palo Pinto Bond Company LLC |
| Production reports | Palo Pinto Bond Company, LLCthrough Mar 2018 |
| Latest permit | Upham Oil & Gas CompanyOct 21, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 2
- permits on file
- Oct 21, 2008
- last permit issued
- Oct 11, 2010
- completed
- 0
- cumulative oil, bbl
- 157K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2010 THROUGH Jul 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 11, 2010
- Shut in
- —
- Plugged
- Jul 6, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clark, Grahame G-13-259723 | Newark, East (Barnett Shale) | Palo Pinto Bond Company, LLC | 1 | 0 | 157K | Oct 2010 – Jul 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Upham Oil & Gas CompanyNov 2010 → Jun 2014
- 2Sable Operating CompanyOct 2014 → Jul 2016
- 3Palo Pinto Bond Company, LLCDec 2016 → Mar 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 673267-98 | Drill | Upham Oil & Gas Company | May 14, 2010 | Oct 21, 2008 | Jun 30, 2010 | 4,999 |
| 673267-99 | Drill | Upham Oil & Gas Company | Oct 16, 2008 | Oct 21, 2008 | — | 4,975 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-259723 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,214 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 4,053 | -2,839 |
| BarnettBARNETT SHALE | 4,271 | -3,057 |
| Ellenburger | 4,456 | -3,242 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,274 | 4,284 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 320 | 12.25 | 210 S |
| 5.5 | 4,575 | 7.875 | 220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 10, 2011 | Nov 30, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-35869 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-35869 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36335869, documented in the API reference.