WELL · 42-363-35939 · DISTRICT 7
Rocking R Ranch #1
Palo Pinto County · Harken (Conglomerate) field · Producing · Vertical
Rocking R Ranch #1 (API 42-363-35939) is a well in Palo Pinto County operated by Tarpon Oil & Gas CO., completed April 1, 2011 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2009 and 2011, permitted to 4,999 ft.
Completion filings report one formation top, including Harken (Conglmerate).
No lease production has been reported under this well’s leases.
Operator of record
Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · 67 permits on file · (817) 475-7802
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tarpon Oil & Gas Co. |
| Production reports | Tarpon Oil & Gas Co.through Feb 2024 |
| Latest permit | Tarpon Oil & Gas Co.May 19, 2011 |
- 4,999
- total depth, ft
- 2
- permits on file
- May 19, 2011
- last permit issued
- Apr 1, 2011
- completed
- 0
- cumulative oil, bbl
- 1.03M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 1, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rocking R Ranch G-8-254114 | Rocking R (Miss) | Tarpon Oil & Gas Co. | 1 | 0 | 41.1K | Jul 2009 – Jul 2026 |
| Rocking "R" Ranch G-8-260657 | Harken (Conglomerate) | Tarpon Oil & Gas Co. | 1 | 0 | 989K | Apr 2011 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tarpon Oil & Gas Co.Aug 2010 → Feb 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 716194-99 | Recompletion | Tarpon Oil & Gas Co. | May 11, 2011 | May 19, 2011 | Mar 14, 2011 | 3,970 |
| 682128-99 | Drill | Tarpon Oil & Gas Co. | Jun 15, 2009 | Jun 16, 2009 | Jun 28, 2009 | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-254114 | — | — | — | — |
| — | — G-8-260657 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 902 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Harken (Conglmerate) | 3,491 | -2,589 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,491 | 3,499 | Perforated |
| 3,790 | 3,810 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 221 | 12.25 | 110 S |
| 4.5 | 3,970 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 30, 2011 | May 20, 2011 | — |
| 00 | Mar 29, 2010 | Oct 15, 2009 | Yes |
| 00 | Jan 21, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-35939 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-35939 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36335939, documented in the API reference.