WELL · 42-363-36124 · DISTRICT 7

J.D. Johnson Ranch #2

N

Palo Pinto County · Burns-Dalton(marble Falls) field  · Vertical

J.D. Johnson Ranch #2 (API 42-363-36124) is a well in Palo Pinto County operated by Eagleridge Operating LLC, completed August 18, 2013.

The RRC has issued one drilling permit, issued March 12, 2013, permitted to 6,000 ft.

It was permitted by Veritas Energy, LLC and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Bend, Marble Falls.

Its 2 leases have reported 24.9K barrels of oil and 619K mcf of gas since January 2013, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Eagleridge Operating LLC

Permitted by Veritas Energy, LLC; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 4, 2026 · 129 permits on file · (855) 820-6008

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsEagleridge Operating, LLCthrough Aug 2023
Latest permitVeritas Energy, LLCMar 12, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
Mar 12, 2013
last permit issued
Aug 18, 2013
completed
24.9K
cumulative oil, bbl
619K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 2013
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
J.D. Johnson Ranch G-8-285927Burns-Dalton(marble Falls)Eagleridge Operating, LLC102.92KOct 2018 – Jul 2026
J.D. Johnson Ranch O-8-31216Burns-Dalton(marble Falls)Eagleridge Operating, LLC324.9K616KJan 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Veritas Energy, LLCJan 2013 → May 2014
  2. 2Brigadier Operating, LLCJun 2014 → Aug 2017
  3. 3Petrobal Omega 1, LLCSep 2017 → Jul 2021
  4. 4Eagleridge Operating, LLCSep 2021 → Jul 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
757960-99DrillVeritas Energy, LLCMar 5, 2013Mar 12, 2013Jul 8, 20136,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-285927————
—— O-8-31216————

Formation tops

As filed on W-2/G-1. Subsea from 962 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,900-2,938
Bend4,170-3,208
Marble Falls4,600-3,638

Perforations

Perforated and open-hole intervals.

FromToType
4,6134,615Perforated
4,6134,830Perforated
4,6364,638Perforated
4,6604,662Perforated
4,7004,702Perforated
4,7324,734Perforated
4,7504,752Perforated
4,7804,782Perforated
4,8284,830Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62531212.25200 S
5.55,1247.875145 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 4, 2019Nov 9, 2018Yes
00Aug 29, 2014Aug 15, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36336124, documented in the API reference.