WELL · 42-363-36177 · DISTRICT 7
Bonnie #1 A
Palo Pinto County · J.B.T. (Conglomerate) field · Vertical
Bonnie #1 A (API 42-363-36177) is a well in Palo Pinto County operated by Athena Resources Inc., completed November 18, 2013.
The RRC has issued one drilling permit (amended once), issued September 20, 2013, permitted to 4,600 ft.
Completion filings report 3 formation tops, including Strawn, Conglomerate, Marble Falls.
Its 2 leases have reported 984 barrels of oil and 286K mcf of gas since November 2013, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Jun 10, 2022 · 57 permits on file · (214) 542-3486
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Athena Resources Inc. |
| Production reports | Tracer Operating, Inc.through Apr 2026 |
| Latest permit | Athena Resources, Inc.Sep 20, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 2
- permits on file
- Sep 20, 2013
- last permit issued
- Nov 18, 2013
- completed
- 984
- cumulative oil, bbl
- 286K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 18, 2013
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bonnie G-8-285363 | J.B.T. (Conglomerate) | Tracer Operating, Inc. | 1 | 0 | 147K | Oct 2017 – Jul 2026 |
| Bonnie O-8-31384 | J.B.T. (Conglomerate) | Athena Resources, Inc. | 1 | 984 | 139K | Nov 2013 – Jul 2026 |
Gas, mcf lease total
Last 12 months 7,497 · prior 12 26,060(-71%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Athena Resources, Inc.Nov 2013 → Apr 2022
- 2Tracer Operating, Inc.May 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 770124-98 | Drill | Athena Resources, Inc. | Sep 26, 2013 | Sep 20, 2013 | Sep 25, 2013 | 4,600 |
| 770124-99 | Drill | Athena Resources, Inc. | Sep 17, 2013 | Sep 20, 2013 | — | 4,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-285363 | — | — | — | — |
| — | — O-8-31384 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,102 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 875 | 227 |
| Conglomerate | 3,500 | -2,398 |
| Marble Falls | 3,900 | -2,798 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,547 | 3,564 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 283 | 12.25 | 200 S |
| 4.5 | 4,399 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 2, 2019 | Oct 22, 2018 | — |
| 00 | Feb 7, 2014 | Dec 3, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-36177 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-36177 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36336177, documented in the API reference.