WELL · 42-365-01147 · DISTRICT 6

Dunaway #3

N

Panola County · Carthage (Pettit Upper) field  · Vertical

Dunaway #3 (API 42-365-01147) is a permitted well in Panola County filed by Glassell Producing Company, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1994 and 2011, permitted to 7,800 ft.

It was permitted by Glassell Producing Company, Inc. and has since transferred to Glassell Alfred C. JR. on the wellbore schedule.

Completion filings report one formation top, including Na.

Operator of record

Glassell Alfred C. Jr.

Permitted by Glassell Producing Company, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 8, 2008 · 71 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGlassell Alfred C. Jr.
Production reportsGlassell Producing Company, Inc.through Apr 2026
Latest permitGlassell Producing Company, Inc.Jan 4, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,800
total depth, ft
2
permits on file
Jan 4, 2011
last permit issued
—
completed
0
cumulative oil, bbl
2.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dunaway G-6-151891Carthage (Travis Peak)Glassell Producing Company, Inc.102.45MNov 1994 – Jul 2026
Dunaway Gas Unit G-6-260770Carthage (Pettit, Lower)Glassell Producing Company, Inc.10488KApr 2010 – Jul 2026
Dunaway, A. /Ola #1/ G-6-29615Carthage (Hill, North)Glassell, Alfred C., Jr.100Jan 1993 – Nov 1994
Dunaway G-6-29729Carthage (Pettit, Upper)Glassell, Alfred C., Jr.100Jan 1993 – Nov 1994

Gas, mcf lease total

Last 12 months 15,197 · prior 12 19,319(-21%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Glassell, Alfred C., Jr.Nov 1994 → Apr 2007
  2. 2Glassell Producing Company, Inc.May 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
707593-99RecompletionGlassell Producing Company, Inc.Dec 27, 2010Jan 4, 2011Mar 5, 20106,545
428112-99RecompletionGlassell, Alfred C., Jr.Sep 16, 1994Sep 21, 1994Oct 6, 19947,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-29615————
—— G-6-29729————
—— G-6-151891————
—— G-6-260770————

Formation tops

As filed on W-2/G-1. Subsea from 224 ft elevation.Download CSV →

FormationMD ftSubsea
NA——

Perforations

Perforated and open-hole intervals.

FromToType
5,8745,908Perforated
5,9315,934Perforated
5,9585,985Perforated
6,3626,370Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75706——
4.54,545—180 S
74,929——
5.55,766——
46,5454.75100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 14, 2011Feb 25, 2011—
00Dec 13, 1994Nov 18, 1994Yes
00Dec 9, 1994——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36501147, documented in the API reference.