WELL · 42-365-30101 · DISTRICT 6

Lawless Unit #5

N

Panola County  · Vertical

Lawless Unit #5 (API 42-365-30101) is a former disposal or injection well in Panola County, last operated by Xto Energy Inc.; its UIC permit is no longer active.

The RRC has issued 4 drilling permits between 1990 and 2013, permitted to 9,200 ft.

Completion filings report 3 formation tops, including Pine Island, Pettit, Travis Peak.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Oct 8, 2013
9,200
total depth, ft
4
permits on file
Oct 8, 2013
last permit issued
—
completed
0
cumulative oil, bbl
1.06M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lawless G-6-190218Bethany (Travis Peak)XTO Energy Inc.10513KAug 2002 – Jul 2026
Lawless G-6-135514Bethany (Travis Peak 6200)Totalfinaelf E&P USA Inc10547KJan 1993 – Aug 2002
— G-6-60851——000—

Gas, mcf lease total

Last 12 months 1,970 · prior 12 2,029(-3%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → May 1997
  2. 2Totalfinaelf E&P USA IncAug 2002 → Aug 2003
  3. 3Total E&P USA, Inc.Sep 2003 → Feb 2006
  4. 4XTO Energy Inc.Mar 2006 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770788-99RecompletionXTO Energy Inc.Sep 30, 2013Oct 8, 2013—9,200
520193-99RecompletionTotalfinaelf E&P USA IncMay 20, 2002Jun 17, 2002Jul 13, 20026,320
493245-99RecompletionFina Oil & Chemical CompanyMar 20, 2000Apr 24, 2000—6,320
374815-99RecompletionFina Oil & Chemical CompanyJun 22, 1990Jul 3, 1990—9,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-60851————
—— G-6-135514————
—— G-6-190218————

Formation tops

As filed on W-2/G-1. Subsea from 334 ft elevation.Download CSV →

FormationMD ftSubsea
Pine Island5,419-5,085
PettitPETTET5,535-5,201
Travis Peak5,875-5,541
Travis PeakBASE TRAVIS PEAK7,932-7,598

Perforations

Perforated and open-hole intervals.

FromToType
5,8995,902Perforated
6,2006,210Perforated
8,2708,352Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37563——
9.6252,90512.25850 S
9.6252,905——
5.59,1078.751,475 S
5.59,107——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 2002Aug 23, 2002Yes
00Sep 5, 2002——
00Dec 10, 1990Jul 16, 1990Yes
00Sep 5, 1990——
00Jan 12, 1984Jan 2, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092037W-14 DisposalNot activated1,2502,4004,800–4,968

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530101, documented in the API reference.