WELL · 42-365-30591 · DISTRICT 6
Wright-Twomey G.U. #1
Panola County · Carthage SE (CV) field · Vertical
Wright-Twomey G.U. #1 (API 42-365-30591) is a well in Panola County operated by Reef Exploration Inc. (A-1), completed May 1, 1978.
The RRC has issued 2 drilling permits between 1977 and 1997, permitted to 10,000 ft.
No lease production has been reported under this well’s leases.
Operator of record
Richardson, TX · P-5 Y, filed Oct 6, 2006 · 97 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Reef Exploration Inc. (A-1) |
| Production reports | Proline Energy Resources Incthrough Apr 2026 |
| Latest permit | Reef Exploration, Inc. (A-1)Aug 28, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 2
- permits on file
- Aug 28, 1997
- last permit issued
- May 1, 1978
- completed
- 0
- cumulative oil, bbl
- 946K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 1, 1978
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wright-Twomey G-6-166997 | Carthage (Travis Peak-Collins) | Proline Energy Resources Inc | 1 | 0 | 819K | Dec 1997 – Jul 2026 |
| Wright-Twomey G.U. G-6-76791 | Carthage, SE (CV) | Reef Exploration, Inc. (A-1) | 1 | 0 | 127K | Jan 1993 – Dec 1997 |
Gas, mcf lease total
Last 12 months 2,836 · prior 12 3,468(-18%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kerr-McGee CorporationJan 1993 → Jan 1995
- 2Reef Exploration, Inc. (A-1)Apr 1998 → May 2000
- 3O'Benco, Inc.Jun 2000 → Jun 2015
- 4Proline Energy Resources IncMay 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 466875-99 | Recompletion | Reef Exploration, Inc. (A-1) | Aug 28, 1997 | Aug 28, 1997 | Dec 10, 1997 | 9,700 |
| 2691-99 | Drill | Delta Drilling Co. | Jul 11, 1977 | Jul 11, 1977 | Jan 1, 1978 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-76791 | — | — | — | — |
| — | — G-6-166997 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,494 | 6,514 | Perforated |
| 6,646 | 6,654 | Perforated |
| 8,782 | 8,914 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 60 | 16 | 60 S |
| 13.375 | 60 | 24 | 60 S |
| 9.625 | 1,833 | 10.75 | 565 S |
| 9.625 | 1,833 | 12.25 | 565 S |
| 5.5 | 9,610 | 8.75 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 28, 1998 | Feb 2, 1998 | Yes |
| 00 | Mar 13, 1998 | — | — |
| 00 | Jan 12, 1984 | Jun 1, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-30591 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-30591 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36530591, documented in the API reference.