WELL · 42-365-30714 · DISTRICT 6

Longino et al Unit #1

Plugged

Panola County · Carthage (Cotton Valley) field  · Vertical

Longino ET AL Unit #1 (API 42-365-30714) is a plugged well in Panola County, plugged June 19, 1999, last operated by Lacy R. Inc..

The RRC has issued 2 drilling permits between 1978 and 1992, permitted to 10,000 ft.

Its 2 leases have reported 6.49K barrels of oil and 22 mcf of gas since January 1993, last reporting in August 1999.

Operator of record

Lacy R. Inc.

Longview, TX · P-5 Y, filed Apr 5, 2002 · 260 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLacy R. Inc.
Production reportsLacy, R., Inc.through Apr 1998
Latest permitLacy, R., Inc.Apr 17, 1992
10,000
total depth, ft
2
permits on file
Apr 17, 1992
last permit issued
Sep 1, 1978
completed
6.49K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 1, 1978
Shut in
—
Plugged
Jun 19, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Longino O-6-13004Carthage (Burnett Sand)Lacy, R., Inc.16.49K22Jan 1993 – Aug 1999
— G-6-79380——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lacy, R., Inc.Jan 1993 → Apr 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398386-99RecompletionLacy, R., Inc.Apr 14, 1992Apr 17, 1992Mar 23, 19926,400
18358-99DrillKey Production Co.Feb 15, 1978Feb 15, 1978Mar 31, 197810,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-79380————
—— O-6-13004————

Perforations

Perforated and open-hole intervals.

FromToType
6,2656,308Perforated
8,5489,354Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,59312.25700 S
4.59,7457.8751,180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 1992Apr 10, 1992Yes
00May 1, 1992——
00Jan 12, 1984Nov 15, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530714, documented in the API reference.