WELL · 42-365-30751 · DISTRICT 6

Werner-Carrington #2

Plugged

Panola County · Carthage (Travis Peak-Deadwood) field  · Vertical

Werner-Carrington #2 (API 42-365-30751) is a plugged well in Panola County, plugged October 13, 2020, last operated by Texaco Producing Inc..

The RRC has issued 4 drilling permits between 1978 and 2000, permitted to 10,200 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Texaco Producing Inc. on the wellbore schedule.

Operator of record

Texaco Producing Inc.

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Sep 1, 1992 · 780 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco Producing Inc.
Production reportsChevron U. S. A. Inc.through Jan 2017
Latest permitTexaco E & P Inc.Jun 1, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,200
total depth, ft
4
permits on file
Jun 1, 2000
last permit issued
Nov 25, 1987
completed
0
cumulative oil, bbl
207K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 25, 1987
Shut in
—
Plugged
Oct 13, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Werner-Carrington Unit G-6-178398Carthage (Pettit, Lower Gas)Chevron U. S. A. Inc.10201KJun 2000 – Oct 2020
Werner-Carrington G-6-136571Carthage (Jeter)Texaco E & P Inc.105.82KJan 1993 – Jun 2000
— G-6-126015——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Sep 1999 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jan 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495478-99RecompletionTexaco E & P Inc.May 25, 2000Jun 1, 2000Jun 15, 200010,200
379919-99RecompletionTexaco Producing Inc.Oct 22, 1990Oct 29, 1990—8,367
337317-99RecompletionTexaco Producing Inc.Oct 13, 1987Oct 19, 1987—10,200
24411-99DrillGetty Oil Co.May 16, 1978May 16, 1978Jun 26, 197810,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-126015————
—— G-6-136571————
—— G-6-178398————

Perforations

Perforated and open-hole intervals.

FromToType
5,1865,189Perforated
6,1096,115Perforated
6,1386,146Perforated
6,1666,174Perforated
6,1926,200Perforated
6,2136,221Perforated
6,2396,245Perforated
6,5506,564Perforated
8,7158,770Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,53731,285 S
9.6252,53712.251,285 S
5.510,1978.752,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 2, 2000Jul 25, 2000—
00Sep 8, 2000——
00Feb 15, 1991Nov 30, 1990Yes
00Jan 22, 1991——
00Jan 15, 1988Dec 17, 1987Yes
00Jan 12, 1988——
00Jan 12, 1984Feb 15, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530751, documented in the API reference.