WELL · 42-365-30816 · DISTRICT 6
Fleming #1
Panola County · Vertical
Fleming #1 (API 42-365-30816) is a plugged well in Panola County, plugged November 16, 1978, last operated by Pinewood Exploration Inc..
The RRC has issued 2 drilling permits between 1978 and 1983, permitted to 10,000 ft.
Completion filings report 6 formation tops, including Paluxy, Glen Rose, James Lime, Pettit.
Operator of record
Arlington, TX · P-5 Y, filed Jun 3, 2011 · 26 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | TGNR East Texas LLCthrough Dec 2024 |
| Latest permit | Pinewood Exploration Inc.Oct 11, 1983 |
- 10,000
- total depth, ft
- 2
- permits on file
- Oct 11, 1983
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 579K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 16, 1978
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| South Gary Unit 2 G-6-110331 | Carthage (Cotton Valley) | TGNR East Texas LLC | 1 | 0 | 579K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 47(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pinewood Exploration Inc.Jan 1993 → Jul 1996
- 2Union Pacific Resources CompanyAug 1996 → Jan 2001
- 3Rme Petroleum CompanyFeb 2001 → Nov 2002
- 4Anadarko E&P Company LPDec 2002 → Dec 2012
- 5Anadarko E&P Onshore LLCJan 2013 → Nov 2016
- 6Cci East Texas Upstream LLCDec 2016 → Jan 2021
- 7TGNR East Texas LLCFeb 2021 → Dec 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 218725-99 | Other | Pinewood Exploration Inc. | Jul 18, 1983 | Oct 11, 1983 | — | 10,000 |
| 32181-99 | Drill | Gibson Drlg. Co. | Sep 8, 1978 | Sep 8, 1978 | Sep 25, 1978 | 9,933 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-110331 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 299 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 3,330 | -3,031 |
| Glen Rose | 3,586 | -3,287 |
| James LimeJAMES | 5,770 | -5,471 |
| PettitPETTET | 6,030 | -5,731 |
| Travis Peak | 6,588 | -6,289 |
| Cotton Valley | 8,338 | -8,039 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,464 | 9,522 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,592 | 12.25 | 700 S |
| 4.5 | 9,664 | 7.875 | 2,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 24, 1984 | May 1, 1984 | — |
| 00 | May 15, 1984 | May 1, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-30816 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-30816 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36530816, documented in the API reference.