WELL · 42-365-31069 · DISTRICT 6

Penna - Sikes Unit #3

Plugged

Panola County · Carthage (Travis Peak) field  · Horizontal

Penna - Sikes Unit #3 (API 42-365-31069) is a plugged horizontal well in Panola County, plugged January 30, 2012, last operated by Texaco E & P Inc..

The RRC has issued 4 drilling permits between 1979 and 2004, permitted to 9,600 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Texaco E & P Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Glen Rose, Mass. Anhydrite.

Operator of record

Texaco E & P Inc.

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Delinquent, filed Jan 22, 2003 · 3,332 permits on file · (281) 561-3713

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco E & P Inc.
Production reportsChevron U. S. A. Inc.through Aug 2010
Latest permitChevron U. S. A. Inc.Feb 11, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,600
total depth, ft
4
permits on file
Feb 11, 2004
last permit issued
Jan 20, 1994
completed
0
cumulative oil, bbl
107K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 20, 1994
Shut in
—
Plugged
Jan 30, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sikes, Penna G-6-203232Carthage (Paluxy)Chevron U. S. A. Inc.1023.2KMay 2004 – Jan 2012
Sikes, Penna Unit G-6-180089Carthage (James Lime)Chevron U. S. A. Inc.1024KJul 2000 – May 2004
Penna - Sikes Unit G-6-148967Carthage (Travis Peak)Texaco E & P Inc.1047.5KJan 1994 – Jul 2000
Penna-Sixes Unit G-6-89309Carthage (Cotton Valley)Texaco E & P Inc.1012.7KJan 1993 – Aug 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541872-99RecompletionChevron U. S. A. Inc.Feb 10, 2004Feb 11, 2004Apr 27, 20044,200
495381-99DrillTexaco E & P Inc.May 23, 2000May 24, 2000Jun 23, 20005,600
418578-99RecompletionTexaco E & P Inc.Nov 22, 1993Feb 28, 1994Jan 6, 19948,900
67236-99DrillGetty Oil Co.Dec 19, 1979Dec 19, 1979Dec 31, 19799,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-89309————
—— G-6-148967————
—— G-6-180089————
—— G-6-203232————

Formation tops

As filed on W-2/G-1. Subsea from 210 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose3,206-2,996
Mass. Anhydrite4,726-4,516

Perforations

Perforated and open-hole intervals.

FromToType
3,0323,049Perforated
5,6406,559Perforated
6,9146,920Perforated
8,9179,476Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
165726—
9.6252,50212.251,148 S
2.3758,893——
5.59,6397.8751,269 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 2004Jul 29, 2004—
00Sep 10, 2004——
00Mar 5, 2001Aug 23, 2000Yes
00Jan 3, 2001——
00May 16, 1994Mar 3, 1994Yes
00May 5, 1994——
00Jan 12, 1984Sep 2, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531069, documented in the API reference.