WELL · 42-365-31555 · DISTRICT 6

Markey Gas Unit #2

Y

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Markey Gas Unit #2 (API 42-365-31555) is a well in Panola County operated by Tgnr East Texas LLC, completed July 4, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 31, 1982, permitted to 10,000 ft.

It was permitted by Mcgoldrick Oil CO. and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by McGoldrick Oil Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 41 permits on file · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Apr 2026
Latest permitMcGoldrick Oil Co.Dec 31, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
1
permits on file
Dec 31, 1982
last permit issued
Jul 4, 1984
completed
0
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 4, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Markey Gas Unit G-6-112895Carthage (Cotton Valley)TGNR East Texas LLC101.25MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 216 · prior 12 663(-67%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  5. 5Cci East Texas Upstream LLCDec 2016 → Jan 2021
  6. 6TGNR East Texas LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
182742-99DrillMcGoldrick Oil Co.Dec 31, 1982Dec 31, 1982Feb 10, 198310,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-112895————

Formation tops

As filed on W-2/G-1. Subsea from 309 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,440-5,131
James LimeJAMES5,860-5,551
Pettit6,100-5,791
Travis Peak6,372-6,063
Cotton Valley8,620-8,311

Perforations

Perforated and open-hole intervals.

FromToType
8,9949,004Perforated
9,1129,120Perforated
9,1329,140Perforated
9,7629,799Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,02812.25665 S
5.59,9598.75931 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 14, 1995Jul 28, 1995—
00Jun 7, 1985May 23, 1985—
00Jun 6, 1985May 23, 1985—
00Dec 12, 1984Aug 8, 1984—
00Dec 11, 1984Jun 30, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531555, documented in the API reference.