WELL · 42-365-31744 · DISTRICT 6

Davis #1

Plugged

Panola County  · Vertical

Davis #1 (API 42-365-31744) is a plugged well in Panola County, plugged January 2, 1986, last operated by Davis Operating Company.

The RRC has issued 2 drilling permits between 1985 and 1987, permitted to 6,800 ft.

Completion filings report 2 formation tops, including Pettit, Travis Peak.

Operator of record

Davis Operating Company

Elysian Field, TX · P-5 Y, filed Feb 3, 2006 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitDavis Operating CompanyMay 11, 1987
6,800
total depth, ft
2
permits on file
May 11, 1987
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 2, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis G-6-125798Bethany, SW. (Travis Peak)Key Energy Services, LLC100Jan 1993 – Apr 2020

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
330024-99ReenterDavis Operating CompanyMay 11, 1987May 11, 1987—6,800
268474-99DrillB & N Petroleum, Inc.Feb 20, 1985Mar 5, 1985—6,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-125798————

Formation tops

As filed on W-2/G-1. Subsea from 344 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit6,100-5,756
Travis Peak6,228-5,884

Perforations

Perforated and open-hole intervals.

FromToType
5,1965,396Perforated
6,6726,682Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00512.25491 S
56,7207.875460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 24, 2017Aug 12, 2013—
00Jul 24, 2006Feb 2, 2006—
00Jan 6, 2006Oct 26, 2005—
00Jan 13, 1988Dec 2, 1987Yes
00Jan 9, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
8.4M
bbl, all reported
Nov 2019
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095826H-1 InjectionPlugged May 5, 202010,0002,2955,196–5,396

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120182019

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531744, documented in the API reference.