WELL · 42-365-31825 · DISTRICT 6
Carthage Gas Unit #51
Panola County · Vertical
Carthage Gas Unit #51 (API 42-365-31825) is a permitted well in Panola County filed by Eog Resources, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1986 and 2001, permitted to 10,000 ft.
Completion filings report 4 formation tops, including Hill, Pettit, Travis Peak, Cotton Valley.
Operator of record
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,348 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Eqv Operating LLCthrough Apr 2026 |
| Latest permit | EOG Resources, Inc.Jul 20, 2001 |
- 10,000
- total depth, ft
- 3
- permits on file
- Jul 20, 2001
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 453K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carthage Gas Unit G-6-122937 | Carthage (Cotton Valley) | Eqv Operating LLC | 1 | 0 | 453K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 5,836 · prior 12 5,637(+4%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Erso, Inc.Jan 1993 → Mar 1995
- 2Enron Oil & Gas CompanyApr 1995 → Sep 1999
- 3EOG Resources, Inc.Oct 1999 → Sep 2000
- 4Wildhorse Resources, LLCMar 2012 → Jun 2013
- 5Memorial Production Oper. LLCJul 2013 → Apr 2016
- 6Amplify Energy Operating LLCDec 2020 → Dec 2025
- 7Eqv Operating LLCJan 2026 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 511666-99 | Recompletion | EOG Resources, Inc. | Jul 20, 2001 | Jul 20, 2001 | — | 9,750 |
| 437903-99 | Recompletion | Enron Oil & Gas Company | Jul 17, 1995 | Jul 17, 1995 | Jun 28, 1995 | 9,750 |
| 305756-99 | Drill | Erso, Inc. | Aug 28, 1986 | Aug 28, 1986 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-122937 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 203 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hill | 4,900 | -4,697 |
| PettitUPPER PETTIT | 5,660 | -5,457 |
| PettitLOWER PETTIT | 5,860 | -5,657 |
| Travis Peak | 6,028 | -5,825 |
| Cotton Valley | 8,066 | -7,863 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,438 | 8,454 | Perforated |
| 9,130 | 9,215 | Perforated |
| 9,493 | 9,530 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | 22 | 88 S |
| 9.625 | 1,676 | 12.25 | 558 S |
| 5.5 | 9,750 | 8.75 | 1,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 22, 1996 | Oct 10, 1995 | — |
| 00 | Jan 13, 1987 | Dec 29, 1986 | Yes |
| 00 | Jan 9, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-31825 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-31825 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36531825, documented in the API reference.