WELL · 42-365-31860 · DISTRICT 6

CJV SWD #2

WaterY

Panola County · Carthage (Pettit Upper) field · Injection  · Vertical

Cjv Swd #2 (API 42-365-31860) is a well in Panola County operated by Tgnr East Texas LLC, completed January 15, 2016 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 4, 1987, permitted to 6,300 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, James Lime, Pine Island, Pettit.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 1.47M barrels injected in the 12 months reported through March 2026.

Operator of record

TGNR East Texas LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 41 permits on file · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsnone
Latest permitUnion Pacific Resources CompanyJun 4, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
1
permits on file
Jun 4, 1987
last permit issued
Jan 15, 2016
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 15, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
CJV SWD G-6-125612Carthage (Pettit, Upper)TGNR East Texas LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
331109-99DrillUnion Pacific Resources CompanyJun 3, 1987Jun 4, 1987Jul 29, 19876,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-125612————

Formation tops

As filed on W-2/G-1. Subsea from 357 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,115-4,758
James Lime5,590-5,233
Pine Island5,725-5,368
PettitUPPER PETTIT5,840-5,483
PettitLOWER PETTIT6,005-5,648
Pettit6,150-5,793

Perforations

Perforated and open-hole intervals.

FromToType
5,8695,902Perforated
5,8705,902Perforated
6,0206,050Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1664—250 S
10.752,62113.51,225 S
4.56,1506.5840 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 22, 2016Jan 26, 2016—
00Nov 14, 1994Oct 6, 1994—
00Jun 17, 1988May 19, 1988—
00Apr 5, 1988Oct 22, 1987—
00Mar 30, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.47M
bbl, last 12 reported months
62.7M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066369H-1 InjectionActive20,0002,5005,840–6,050

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,471,194 · prior 12 1,293,677(+14%)

050K100K150K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531860, documented in the API reference.