WELL · 42-365-31912 · DISTRICT 6

Hodge F.L. #2T

Y

Panola County · Briggs (Upper Travis Peak) field · Temp Abandoned  · Vertical

Hodge F.L. #2T (API 42-365-31912) is a well in Panola County operated by Xto Energy Inc., completed November 8, 1998 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1988 and 1990, permitted to 8,200 ft.

It was permitted by Sonat Exploration Company and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including BMA, James Lime, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

XTO Energy Inc.

Permitted by Sonat Exploration Company; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Dec 2009
Latest permitSonat Exploration CompanyJun 29, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,200
total depth, ft
3
permits on file
Jun 29, 1990
last permit issued
Nov 8, 1998
completed
0
cumulative oil, bbl
832K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 8, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hodge, F.L. G-6-128812Briggs (Rodessa)XTO Energy Inc.100Jan 1993 – Jul 2026
Hodge, F.L. G-6-135339Briggs (Upper Travis Peak)XTO Energy Inc.10832KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration Company -TylerJan 1993 → Dec 1999
  2. 2EL Paso Production CompanyJan 2000 → Mar 2002
  3. 3Hunt Petroleum CorporationApr 2002 → Nov 2008
  4. 4XTO Energy Inc.Dec 2008 → Dec 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
375051-99RecompletionSonat Exploration CompanyJun 29, 1990Jun 29, 1990—8,182
348953-98DrillSonat Exploration CompanyJul 27, 1988Jul 15, 1988Aug 29, 19888,200
348953-99DrillSonat Exploration CompanyJul 15, 1988Jul 15, 1988—8,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-128812————
—— G-6-135339————

Formation tops

As filed on W-2/G-1. Subsea from 262 ft elevation.Download CSV →

FormationMD ftSubsea
BMA5,050-4,788
James LimeJAMES5,530-5,268
Pettit5,876-5,614
Travis Peak6,160-5,898

Perforations

Perforated and open-hole intervals.

FromToType
5,1725,186Perforated
5,1765,182Perforated
6,2826,289Perforated
6,3436,350Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625340——
8.62566012.25340 S
5.58,1327.8751,600 S
5.58,132—1,600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 6, 2016Apr 20, 2016—
00Jan 20, 1999Dec 9, 1998—
00Aug 20, 1990Jul 12, 1990—
00Aug 11, 1990—Yes
00Nov 17, 1988Oct 26, 1988Yes
00Nov 10, 1988—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531912, documented in the API reference.