WELL · 42-365-32188 · DISTRICT 6

Panola 2 Unit #4

Y

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Panola 2 Unit #4 (API 42-365-32188) is a well in Panola County operated by Cr2 Energy LLC, completed December 19, 1999 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued August 2, 1989, permitted to 9,600 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Cr2 Energy LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Paluxy, Tma, BMA, Pine Island.

No lease production has been reported under this well’s leases.

Operator of record

CR2 Energy LLC

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Kemah, TX · P-5 Y, filed Jun 4, 2026 · (281) 636-2078

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCR2 Energy LLC
Production reportsDiversified Production LLCthrough Nov 2021
Latest permitPhillips Petroleum CompanyAug 2, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,600
total depth, ft
1
permits on file
Aug 2, 1989
last permit issued
Dec 19, 1999
completed
0
cumulative oil, bbl
963K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 19, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Panola 2 Unit G-6-133709Carthage (Cotton Valley)CR2 Energy LLC10963KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1993 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Nov 2015
  3. 3Tanos Exploration II, LLCJan 2016 → May 2021
  4. 4Diversified Production LLCNov 2021 → Nov 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
362191-99DrillPhillips Petroleum CompanyJul 31, 1989Aug 2, 1989—9,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-133709————

Formation tops

As filed on W-2/G-1. Subsea from 255 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy3,100-2,845
Tma4,880-4,625
BMA5,090-4,835
Pine Island5,727-5,472
Travis Peak6,268-6,013
Cotton Valley8,320-8,065
Cotton Vly8,320-8,065

Perforations

Perforated and open-hole intervals.

FromToType
8,7308,736Perforated
8,8708,890Perforated
8,9909,042Perforated
9,2139,223Perforated
9,2609,280Perforated
9,2609,304Perforated
9,2819,304Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1688——
9.6252,50512.251,160 S
9.6252,5057.8751,300 S
5.59,500—380 S
5.59,5007.8751,680 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2000Apr 12, 1999—
00Dec 18, 1998Nov 30, 1998—
00Sep 24, 1997Aug 20, 1997—
00Mar 27, 1990Mar 5, 1990Yes
00Mar 20, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532188, documented in the API reference.