WELL · 42-365-32371 · DISTRICT 6

Morgan Unit #7

N

Panola County  · Vertical

Morgan Unit #7 (API 42-365-32371) is a permitted well in Panola County filed by Pennzenergy Exp. & Prod., L.L.C.; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1990 and 2000, permitted to 7,800 ft.

Completion filings report 6 formation tops, including Paluxy, Glen Rose, Tma, BMA.

Operator of record

Pennzenergy Exp. & Prod., L.L.C.

Houston, TX · P-5 Y, filed Mar 3, 2000 · 157 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSheridan Production Company, LLCthrough Oct 2019
Latest permitPennzenergy Exp. & Prod., L.L.C.Feb 23, 2000
7,800
total depth, ft
5
permits on file
Feb 23, 2000
last permit issued
—
completed
0
cumulative oil, bbl
293K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morgan Unit G-6-171973Carthage (Pettit, Lower Gas)Diversified Production LLC10238KJan 1999 – Jul 2026
Morgan Unit G-6-140452Carthage (Travis Peak-Collins)Pennzoil Exploration & Prod. Co.1054.5KJan 1993 – Jan 1999
— G-6-137410——000—
— G-6-138763——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Exploration & Prod. Co.Jan 1993 → Apr 1998
  2. 2Pennzenergy Exp. & Prod., L.L.C.Jan 1999 → Feb 2000
  3. 3Devon Energy Production Co, L.P.Apr 2000 → Jun 2016
  4. 4Sheridan Production Company, LLCJul 2016 → Oct 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
492333-99RecompletionPennzenergy Exp. & Prod., L.L.C.Feb 22, 2000Feb 23, 2000—6,030
481705-99RecompletionPennzoil Exploration & Prod. Co.Dec 22, 1998Jan 4, 1999Dec 9, 19986,875
395285-99RecompletionPennzoil Exploration & Prod. Co.Jan 9, 1992Jan 21, 1992Dec 5, 19916,875
387421-99RecompletionPennzoil Exploration & Prod. Co.May 2, 1991May 7, 1991Apr 24, 19916,875
375436-99DrillPennzoil Exploration & Prod. Co.Jul 12, 1990Aug 10, 1990Oct 12, 19907,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-137410————
—— G-6-138763————
—— G-6-140452————
—— G-6-171973————

Formation tops

As filed on W-2/G-1. Subsea from 251 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy2,908-2,657
Glen Rose3,225-2,974
Tma4,693-4,442
BMA4,918-4,667
Sligo5,680-5,429
Travis Peak6,060-5,809

Perforations

Perforated and open-hole intervals.

FromToType
5,9825,996Perforated
6,1346,146Perforated
6,4146,417Perforated
6,6826,689Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00012.25500 S
2.8756,8687.8752,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 12, 1999Feb 12, 1999Yes
00Mar 4, 1999——
00Feb 25, 1992Jan 14, 1992Yes
00Feb 6, 1992——
00Aug 1, 1991May 14, 1991Yes
00Jul 30, 1991——
00Apr 19, 1991Feb 7, 1991Yes
00Mar 28, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532371, documented in the API reference.