WELL · 42-365-32391 · DISTRICT 6

Nolan #1

N

Panola County  · Vertical

Nolan #1 (API 42-365-32391) is a permitted well in Panola County filed by M. E. Operating & Services, Inc.; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1990 and 2005, permitted to 9,700 ft.

Completion filings report 8 formation tops, including BMA, Rodessa, James Lime, Pettit.

Operator of record

M. E. Operating & Services, Inc.

Fort Worth, TX · P-5 Y, filed Jan 5, 2026 · 99 permits on file · (817) 980-5613

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsM. E. Operating & Services, Inc.through May 2017
Latest permitM. E. Operating & Services, Inc.Oct 13, 2005
9,700
total depth, ft
5
permits on file
Oct 13, 2005
last permit issued
—
completed
0
cumulative oil, bbl
225K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nolan G-6-158446Carthage, SE (CV)M. E. Operating & Services, Inc.10225KDec 1995 – Jul 2026
Nolan G-6-141585Carthage (Travis Peak Hull-Gas)Andrew Alan Exploration, Inc.100Jan 1993 – Dec 1995
— G-6-137554——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Andrew Alan Exploration, Inc.Jan 1996 → Nov 1997
  2. 2M. E. Operating & Services, Inc.Sep 2001 → May 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
606430-99RecompletionM. E. Operating & Services, Inc.Sep 15, 2005Oct 13, 2005—9,700
444496-99RecompletionAndrew Alan Exploration, Inc.Feb 5, 1996Apr 4, 1996Dec 12, 19959,700
418137-99RecompletionRichey Properties, Inc.Nov 12, 1993Dec 1, 1993—3,850
399923-99RecompletionSonat Exploration Company-MCRJun 3, 1992Jun 3, 1992May 19, 19929,700
377621-99DrillSonat Exploration Company-MCRSep 6, 1990Sep 6, 1990Nov 19, 19909,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-137554————
—— G-6-141585————
—— G-6-158446————

Formation tops

As filed on W-2/G-1. Subsea from 305 ft elevation.Download CSV →

FormationMD ftSubsea
BMA4,950-4,645
Rodessa5,000-4,695
James Lime5,500-5,195
James LimeJAMES LM5,500-5,195
Pettit5,800-5,495
Travis Peak6,400-6,095
Trvis Peak6,400-6,095
Cottom Valley 'B' LM8,650-8,345
Cotton ValleyCOTTON VALLEY "B" LM8,650-8,345
Cotton ValleyCOTTON VALLEY 'B' LM8,650-8,345
Cotton ValleyCOTTON VALLEY B LM8,650-8,345

Perforations

Perforated and open-hole intervals.

FromToType
6,7356,741Perforated
8,7328,740Perforated
8,9558,965Perforated
9,5309,548Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1680——
9.6251,80012.25850 S
8.6251,80012.25850 S
4.59,7007.8751,860 S
4.59,700—2,760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 10, 1996Feb 1, 1996Yes
00Jun 13, 1996——
00Sep 11, 1992Jul 16, 1992—
00Aug 18, 1992Jul 29, 1992—
00Jul 17, 1992Jun 19, 1992Yes
00Jul 9, 1992——
00Jul 9, 1991May 13, 1991Yes
00May 3, 1991Feb 28, 1991Yes
00Apr 8, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532391, documented in the API reference.