WELL · 42-365-32412 · DISTRICT 6

New Boggy Bayou Baptist Church #2

Y

Panola County · Waskom (Travis Peak 1) field · Producing  · Vertical

New Boggy Bayou Baptist Church #2 (API 42-365-32412) is a well in Panola County operated by Shelby Operating Company, completed November 6, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 14, 1990, permitted to 6,500 ft.

It was permitted by Rbd-Shelby Agency and has since transferred to Shelby Operating Company on the wellbore schedule.

Completion filings report 7 formation tops, including Blossom, Fredericksburg, Fredricksburg, Massive Anhydrite (marker).

No lease production has been reported under this well’s leases.

Operator of record

Shelby Operating Company

Permitted by RBD-Shelby Agency; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Dec 4, 2025 · 86 permits on file · (214) 739-5384

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShelby Operating Company
Production reportsShelby Operating Companythrough Apr 2026
Latest permitRBD-Shelby AgencyNov 14, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
2
permits on file
Nov 14, 1990
last permit issued
Nov 6, 2014
completed
0
cumulative oil, bbl
4.31M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 6, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Boggy Bayou Baptist Church G-6-137418Waskom (Travis Peak 1)Shelby Operating Company104.31MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 42,214 · prior 12 49,942(-15%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1RBD-Shelby AgencyJan 1993 → Dec 1993
  2. 2Shelby Operating CompanyJan 1994 → Apr 2026
  3. 3Hopewell Operating, Inc.Dec 2013 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
379076-98Field transferRBD-Shelby AgencyJul 8, 1992Nov 14, 1990—6,500
379076-99DrillRBD-Shelby AgencyOct 5, 1990Nov 14, 1990Nov 16, 19906,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-137418————

Formation tops

As filed on W-2/G-1. Subsea from 334 ft elevation.Download CSV →

FormationMD ftSubsea
Blossom1,999-1,665
Fredericksburg2,444-2,110
Fredricksburg2,444-2,110
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,567-4,233
James LimeJAMES5,335-5,001
Sligo5,635-5,301
Travis Peak5,987-5,653

Perforations

Perforated and open-hole intervals.

FromToType
6,1486,156Perforated
6,1486,173Perforated
6,1686,178Perforated
6,3026,312Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530012.25190 S
4.56,0705.5115 S
5.56,4287.8752,115 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2016Dec 1, 2014—
00Sep 14, 1992Apr 11, 1991—
00May 16, 1991Apr 12, 1991Yes
00Apr 19, 1991Feb 13, 1991Yes
00Mar 28, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532412, documented in the API reference.