WELL · 42-365-32627 · DISTRICT 6
Holcombe #6
Panola County · Bethany (Cotton Valley) field · Vertical
Holcombe #6 (API 42-365-32627) is a well in Panola County operated by Sonat Exploration Company -Tyler, completed October 22, 1992.
The RRC has issued 3 drilling permits between 1992 and 2008, permitted to 10,040 ft.
It was permitted by Hunt Petroleum Corporation and has since transferred to Sonat Exploration Company -Tyler on the wellbore schedule.
Completion filings report 4 formation tops, including Travis Peak, Base B Lm, Cotton Valley, Cv Taylor.
No lease production has been reported under this well’s leases.
Operator of record
Sonat Exploration Company -Tyler
Permitted by Hunt Petroleum Corporation; the EWA schedule now lists a different operator.
Houston, TX · P-5 New, filed Jun 29, 1992 · 655 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sonat Exploration Company -Tyler |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | Hunt Petroleum CorporationJan 16, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,040
- total depth, ft
- 3
- permits on file
- Jan 16, 2008
- last permit issued
- Oct 22, 1992
- completed
- 0
- cumulative oil, bbl
- 1.85M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 22, 1992
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holcombe G-6-156026 | Briggs (Upper Travis Peak) | XTO Energy Inc. | 1 | 0 | 869K | Aug 1995 – Jul 2026 |
| Holcombe G-6-234859 | Bethany (Cotton Valley) | XTO Energy Inc. | 1 | 0 | 542K | May 2006 – Jul 2026 |
| Holcombe G-6-142984 | Bethany (Cotton Valley) | Sonat Exploration Company -Tyler | 1 | 0 | 444K | Jan 1993 – Dec 1995 |
Gas, mcf lease total
Last 12 months 2,191 · prior 12 1,826(+20%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sonat Exploration Company -TylerJan 1993 → Dec 1999
- 2EL Paso Production CompanyJan 2000 → Mar 2002
- 3Hunt Petroleum CorporationApr 2002 → Nov 2008
- 4XTO Energy Inc.Dec 2008 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 652244-99 | Recompletion | Hunt Petroleum Corporation | Jan 2, 2008 | Jan 16, 2008 | Apr 21, 2006 | 10,040 |
| 439331-99 | Recompletion | Sonat Exploration Company -Tyler | Aug 25, 1995 | Aug 25, 1995 | Aug 13, 1995 | 10,040 |
| 398048-99 | Drill | Sonat Exploration Company-MCR | Apr 2, 1992 | Apr 27, 1992 | Sep 2, 1992 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-142984 | — | — | — | — |
| — | — G-6-156026 | — | — | — | — |
| — | — G-6-234859 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 271 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Travis Peak | 6,288 | -6,017 |
| Base B LM | 8,561 | -8,290 |
| Cotton ValleyCOTTON VALLEY TAYLOR | 9,681 | -9,410 |
| CV Taylor | 9,681 | -9,410 |
| CV Taylor | — | — |
| Travis Peak | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,390 | 6,401 | Perforated |
| 8,600 | 9,903 | Perforated |
| 9,712 | 9,715 | Perforated |
| 9,712 | 9,770 | Perforated |
| 9,718 | 9,725 | Perforated |
| 9,733 | 9,746 | Perforated |
| 9,764 | 9,770 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,220 | 17.5 | 850 S |
| 4.5 | 10,040 | 7.875 | 1,920 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 2012 | Aug 10, 2011 | — |
| 00 | May 20, 2008 | Mar 26, 2008 | Yes |
| 00 | May 12, 2008 | — | — |
| 00 | Jan 10, 1996 | Sep 6, 1995 | Yes |
| 00 | Dec 1, 1995 | — | — |
| 00 | Dec 28, 1992 | Nov 13, 1992 | Yes |
| 00 | Dec 3, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32627 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32627 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532627, documented in the API reference.