WELL · 42-365-32868 · DISTRICT 6

Caudle Dahlia O. Unit 1 #5

Plugged

Panola County · Carthage (Travis Peak) field  · Vertical

Caudle Dahlia O. Unit 1 #5 (API 42-365-32868) is a plugged well in Panola County, plugged April 11, 2025, last operated by Tgnr East Texas LLC.

The RRC has issued 2 drilling permits between 1993 and 2002, permitted to 9,900 ft.

It was permitted by Rme Petroleum Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report one formation top, including Cotton Valley.

Operator of record

TGNR East Texas LLC

Permitted by Rme Petroleum Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 41 permits on file · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsAnadarko E&P Company LPthrough Apr 2008
Latest permitRme Petroleum CompanyNov 1, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
2
permits on file
Nov 1, 2002
last permit issued
Dec 17, 2002
completed
0
cumulative oil, bbl
322K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH May 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 17, 2002
Shut in
—
Plugged
Apr 11, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caudle, Dahlia O. Unit 1 G-6-192293Carthage (Travis Peak)TGNR East Texas LLC1040.7KDec 2002 – May 2025
Caudle, Dahlia O. Unit #1 G-6-150513Carthage (Cotton Valley)Anadarko E&P Company LP10282KMay 1994 – Dec 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyMay 1994 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Aug 2002
  3. 3Anadarko E&P Company LPDec 2002 → Apr 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
525129-99RecompletionRme Petroleum CompanyOct 31, 2002Nov 1, 2002Dec 14, 20029,200
416501-99DrillUnion Pacific Resources CompanySep 28, 1993Oct 1, 1993Mar 5, 19949,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-150513————
—— G-6-192293————

Formation tops

As filed on W-2/G-1. Subsea from 213 ft elevation.Download CSV →

FormationMD ftSubsea
Cotton Valley8,116-7,903

Perforations

Perforated and open-hole intervals.

FromToType
6,6026,612Perforated
6,6606,670Perforated
8,3008,320Perforated
8,3408,350Perforated
8,3508,370Perforated
8,7308,740Perforated
8,7808,800Perforated
8,8508,860Perforated
8,9328,942Perforated
9,0029,012Perforated
9,0289,038Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00112.25280 S
2.8759,1927.8751,120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2003Jan 10, 2003Yes
00Jan 23, 2003——
00Jul 30, 1998Jul 1, 1998—
00Oct 7, 1994May 31, 1994Yes
00Aug 25, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532868, documented in the API reference.