WELL · 42-365-32933 · DISTRICT 6
Cavin Unit #7
Panola County · Bethany (Travis Peak 6510) field · Vertical
Cavin Unit #7 (API 42-365-32933) is a well in Panola County operated by Pennzoil Exploration & Prod. CO., completed June 6, 1994.
The RRC has issued 2 drilling permits between 1994 and 1997, permitted to 8,000 ft.
Completion filings report 6 formation tops, including Blossom, Wash-Fred, BMA, Rodessa.
No lease production has been reported under this well’s leases.
Operator of record
Pennzoil Exploration & Prod. Co.
Carthage, TX · P-5 Y, filed Mar 22, 2001 · 1,023 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pennzoil Exploration & Prod. Co. |
| Production reports | Devon Energy Production Co, L.P.through Nov 2012 |
| Latest permit | Pennzoil Exploration & Prod. Co.Jun 16, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 2
- permits on file
- Jun 16, 1997
- last permit issued
- Jun 6, 1994
- completed
- 0
- cumulative oil, bbl
- 4.25M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1994 THROUGH Sep 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 6, 1994
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cavin Unit G-6-165823 | Bethany (Travis Peak Cons.) | Burk Royalty Co., Ltd. | 1 | 0 | 2.13M | Oct 1997 – Sep 2019 |
| Cavin Unit G-6-151777 | Bethany (McCain) | Devon Energy Production Co, L.P. | 1 | 0 | 1.29M | Aug 1994 – Feb 2008 |
| Cavin Unit G-6-150590 | Bethany (Travis Peak 6510) | Pennzoil Exploration & Prod. Co. | 1 | 0 | 831K | Jun 1994 – Oct 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pennzoil Exploration & Prod. Co.Jun 1994 → Feb 1999
- 2Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
- 3Devon Energy Production Co, L.P.Apr 2000 → Nov 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 463617-99 | Recompletion | Pennzoil Exploration & Prod. Co. | Jun 11, 1997 | Jun 16, 1997 | Oct 3, 1997 | 7,875 |
| 420722-99 | Drill | Pennzoil Exploration & Prod. Co. | Feb 1, 1994 | Feb 2, 1994 | May 2, 1994 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-150590 | — | — | — | — |
| — | — G-6-151777 | — | — | — | — |
| — | — G-6-165823 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 312 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Blossom | 1,847 | -1,535 |
| Wash-Fred | 2,217 | -1,905 |
| BMA | 4,622 | -4,310 |
| Rodessa | 4,690 | -4,378 |
| Pettit | 5,635 | -5,323 |
| Travis Peak | 5,760 | -5,448 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,107 | 6,119 | Perforated |
| 6,143 | 6,149 | Perforated |
| 6,171 | 6,191 | Perforated |
| 6,232 | 6,259 | Perforated |
| 6,538 | 6,567 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,545 | 12.25 | 710 S |
| 2.875 | 7,863 | 8.75 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 13, 2008 | Apr 21, 2008 | — |
| 00 | Jan 26, 1998 | Nov 5, 1997 | Yes |
| 00 | Jan 12, 1998 | — | — |
| 00 | Dec 14, 1994 | Sep 6, 1994 | Yes |
| 00 | Dec 1, 1994 | — | — |
| 00 | Oct 10, 1994 | Jul 8, 1994 | Yes |
| 00 | Aug 29, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32933 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32933 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532933, documented in the API reference.