WELL · 42-365-32943 · DISTRICT 6

Floyd Gas Unit #6

Plugged

Panola County · Bethany (Travis Peak 6400 Gas) field  · Vertical

Floyd Gas Unit #6 (API 42-365-32943) is a plugged well in Panola County, plugged October 12, 2020, last operated by Fina Oil & Chemical Company.

The RRC has issued 2 drilling permits between 1994 and 1997, permitted to 8,000 ft.

Completion filings report 10 formation tops, including Paluxy, Glen Rose, Mooring Port, Mooring Sport.

Operator of record

Fina Oil & Chemical Company

Dallas, TX · P-5 Y, filed Apr 13, 2001 · 1,328 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFina Oil & Chemical Company
Production reportsXTO Energy Inc.through Jan 2015
Latest permitFina Oil & Chemical CompanyJul 18, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
2
permits on file
Jul 18, 1997
last permit issued
Jul 19, 1997
completed
0
cumulative oil, bbl
1.7M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Sep 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 19, 1997
Shut in
—
Plugged
Oct 12, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Floyd Gas Unit G-6-150242Bethany (Travis Peak Cons.)XTO Energy Inc.101.57MMay 1994 – Sep 2020
Floyd Gas Unit G-6-164531Bethany (Travis Peak 6400, Gas)Fina Oil & Chemical Company10135KJul 1997 – Feb 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyMay 1994 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Apr 2003
  3. 3Total E&P USA, Inc.Nov 2003 → Jan 2006
  4. 4XTO Energy Inc.Apr 2006 → Jan 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
464035-99RecompletionFina Oil & Chemical CompanyJun 20, 1997Jul 18, 1997Jun 15, 19977,800
421344-99DrillFina Oil & Chemical CompanyFeb 22, 1994Mar 1, 1994Apr 3, 19948,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-150242————
—— G-6-164531————

Formation tops

As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy2,484-2,210
Glen Rose2,828-2,554
Mooring Port3,650-3,376
Mooring Sport3,650-3,376
Mooringsport3,650-3,376
Massive Anhyd.4,332-4,058
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,332-4,058
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE4,570-4,296
Pettit5,368-5,094
Pettus5,368-5,094
PettitPETTET5,369-5,095
Travis Peak5,708-5,434
Travis Peak5,709-5,435

Perforations

Perforated and open-hole intervals.

FromToType
6,2856,298Perforated
6,5176,572Perforated
7,0727,082Perforated
7,0867,092Perforated
7,2567,652Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,40612.25710 S
4.57,2107.8751,250 S
4.57,8007.8751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 16, 2002Aug 21, 2002—
00Feb 16, 2000Nov 8, 1999Yes
00Oct 8, 1997Aug 27, 1997Yes
00Oct 2, 1997——
00Aug 8, 1994Jun 10, 1994Yes
00Aug 2, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532943, documented in the API reference.