WELL · 42-365-33165 · DISTRICT 6

Jones Elsie #8U

N

Panola County · Carthage (Travis Peak) field  · Vertical

Jones Elsie #8U (API 42-365-33165) is a well in Panola County operated by Exxon Corp., completed November 7, 1995.

The RRC has issued 3 drilling permits between 1995 and 1998, permitted to 9,700 ft.

Completion filings report 4 formation tops, including James Lime, Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Exxon Corp.

Houston, TX · P-5 S, filed Mar 15, 1999 · 19,549 permits on file · (713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitExxon Corp.Feb 26, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,700
total depth, ft
3
permits on file
Feb 26, 1998
last permit issued
Nov 7, 1995
completed
0
cumulative oil, bbl
1.01M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 7, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jones, Elsie G-6-156003Carthage (Cotton Valley)XTO Energy Inc.101MAug 1995 – Jul 2026
Jones, Elsie Unit G-6-179201Carthage (Pettit, Upper)XTO Energy Inc.100Oct 1998 – Jul 2026
Jones, Elsie G-6-160304Carthage (Pettit, Lower Gas)Exxon Corp.104.64KJun 1996 – Sep 1998
Jones, Elsie G-6-158541Carthage (Travis Peak)Exxon Corp.100Nov 1995 – Jun 1996

Gas, mcf lease total

Last 12 months 949 · prior 12 1,768(-46%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Sep 1995 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472656-99RecompletionExxon Corp.Jan 27, 1998Feb 26, 1998Aug 27, 19975,850
445759-99RecompletionExxon Corp.Mar 11, 1996Apr 18, 1996Jun 18, 19956,110
436040-99DrillExxon Corp.May 19, 1995Jun 13, 1995Jun 18, 19959,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-156003————
—— G-6-158541————
—— G-6-160304————
—— G-6-179201————

Formation tops

As filed on W-2/G-1. Subsea from 257 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES5,436-5,179
PettitPETTET5,692-5,435
Pettit5,692-5,435
Travis Peak6,044-5,787
Cotton Valley7,805-7,548

Perforations

Perforated and open-hole intervals.

FromToType
5,7125,744Perforated
5,8915,916Perforated
5,9756,001Perforated
8,3368,348Perforated
8,6708,680Perforated
8,8148,904Perforated
9,1339,155Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,23317.5900 S
10.755,20510.751,100 S
10.755,20512.251,100 S
2.8756,8147.8751,205 S
2.8756,8149.8751,205 S
4.59,3957.875530 S
4.59,3959.875530 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 4, 2001Oct 4, 2000Yes
00Nov 2, 2000——
00Jan 16, 1997Oct 1, 1996—
00Nov 4, 1996——
00Jul 8, 1996Feb 14, 1996—
00Jun 28, 1996——
00Dec 12, 1995Sep 14, 1995Yes
00Nov 30, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533165, documented in the API reference.