WELL · 42-365-33492 · DISTRICT 6

Burnett #3

Plugged

Panola County · Carthage (Burnett Sand) field  · Vertical

Burnett #3 (API 42-365-33492) is a plugged well in Panola County, plugged January 11, 2023, last operated by Enron Oil & Gas Company.

The RRC has issued 2 drilling permits between 1996 and 1997, permitted to 8,000 ft.

Completion filings report 2 formation tops, including Pettit, Travis Peak.

Its 3 leases have reported 71.5K barrels of oil and 628K mcf of gas since October 1996, last reporting in April 2025. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Enron Oil & Gas Company

Houston, TX · P-5 Y, filed Sep 3, 1999 · 2,825 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnron Oil & Gas Company
Production reportsMemorial Production Oper. LLCthrough Jul 2016
Latest permitEnron Oil & Gas CompanyFeb 4, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
2
permits on file
Feb 4, 1997
last permit issued
Oct 10, 1996
completed
71.5K
cumulative oil, bbl
628K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH Apr 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 10, 1996
Shut in
—
Plugged
Jan 11, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burnett G-6-208379Bethany (Travis Peak Cons.)Amplify Energy Operating LLC10179KMar 2005 – Apr 2025
Burnett O-6-13643Bethany (Travis Peak a Sand)EOG Resources, Inc.170.7K443KDec 1996 – Mar 2008
Burnett O-6-13605Carthage (Burnett Sand)Enron Oil & Gas Company18355.83KOct 1996 – Apr 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyOct 1996 → Sep 1999
  2. 2EOG Resources, Inc.Oct 1999 → Apr 2011
  3. 3Wildhorse Resources, LLCMay 2011 → Jun 2013
  4. 4Memorial Production Oper. LLCJul 2013 → Jul 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
457936-99RecompletionEnron Oil & Gas CompanyJan 29, 1997Feb 4, 1997Dec 20, 19966,690
452090-99DrillEnron Oil & Gas CompanyAug 30, 1996Aug 30, 1996Sep 11, 19968,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-208379————
—— O-6-13605————
—— O-6-13643————

Formation tops

As filed on W-2/G-1. Subsea from 212 ft elevation.Download CSV →

FormationMD ftSubsea
PettitUPPER PETTIT5,892-5,680
PettitLOWER PETTIT6,046-5,834
Travis Peak6,198-5,986

Perforations

Perforated and open-hole intervals.

FromToType
6,2926,304Perforated
6,3726,384Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,14412.25370 S
2.8756,6837.875630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 26, 2005Mar 11, 2005—
00May 25, 2005——
00Apr 21, 1997Jan 7, 1997Yes
00Apr 7, 1997Nov 1, 1996Yes
00Apr 1, 1997Nov 1, 1996Yes
00Jan 28, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533492, documented in the API reference.