WELL · 42-365-33900 · DISTRICT 6

Adams G.U. 1 #1

N

Panola County · Carthage (Cotton Valley) field  · Vertical

Adams G.U. 1 #1 (API 42-365-33900) is a well in Panola County operated by Newfield Exploration Company, completed June 23, 1998.

The RRC has issued 2 drilling permits between 1998 and 2004, permitted to 10,150 ft.

Completion filings report 4 formation tops, including James Lime, Sligo, Travis Peak, Cotton Valley.

Its 2 leases have reported 17K barrels of oil and 527K mcf of gas since June 1998, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Newfield Exploration Company

The Woodlands, TX · P-5 Y, filed Jan 5, 2026 · 821 permits on file · (866) 902-0562

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNewfield Exploration Company
Production reportsCraton Operating LLCthrough Jan 2024
Latest permitNewfield Exploration CompanyMar 10, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,150
total depth, ft
2
permits on file
Mar 10, 2004
last permit issued
Jun 23, 1998
completed
17K
cumulative oil, bbl
527K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 23, 1998
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Adams G. U. 1 O-6-14302Carthage (Travis Peak)Craton Operating LLC117K179KJan 2004 – Jul 2026
Adams G.U. 1 G-6-170189Carthage (Cotton Valley)Newfield Exploration Company10348KJun 1998 – May 2004

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200300202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tesoro E&P Company, L.P.Sep 1998 → Dec 1999
  2. 2Eex E&P Company, L.P.Jan 2000 → Jul 2003
  3. 3Newfield Exploration CompanyAug 2003 → Dec 2010
  4. 4Ironwood Oil & Gas LLCNov 2011 → Jun 2014
  5. 5Cl&f Operating LLCJul 2014 → Jan 2020
  6. 6Craton Operating LLCJul 2020 → Jan 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
543042-99RecompletionNewfield Exploration CompanyMar 10, 2004Mar 10, 2004Jan 21, 200410,136
474203-99DrillTesoro E&P Company, L.P.Mar 9, 1998Mar 9, 1998Apr 6, 199810,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-170189————
—— O-6-14302————

Formation tops

As filed on W-2/G-1. Subsea from 339 ft elevation.Download CSV →

FormationMD ftSubsea
James Lime6,000-5,661
SligoSLIGO (PETTIT)6,250-5,911
Travis Peak6,580-6,241
Cotton ValleyCOTTON VALLEY "B" LIME8,670-8,331
Cotton ValleyLOWER COTTON VALLEY9,700-9,361

Perforations

Perforated and open-hole intervals.

FromToType
6,7266,734Perforated
8,6708,778Perforated
9,0109,074Perforated
9,2219,266Perforated
9,5309,630Perforated
9,8469,987Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,53212.25575 S
4.510,1367.8751,178 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 2004Mar 22, 2004Yes
00Apr 16, 2004——
00Oct 28, 1998Sep 11, 1998Yes
00Oct 9, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533900, documented in the API reference.