WELL · 42-365-34654 · DISTRICT 6
Genecov #2D
Panola County · Vertical
Genecov #2D (API 42-365-34654) is a former disposal or injection well in Panola County, last operated by Xto Energy Inc.; its UIC permit is no longer active.
The RRC has issued 2 drilling permits (amended twice) between 2001 and 2014, permitted to 11,000 ft.
Completion filings report 4 formation tops, including Cotton Valley, Taylor, Bossier, Limestone Marker.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | XTO Energy Inc.Mar 28, 2014 |
- 11,000
- total depth, ft
- 4
- permits on file
- Mar 28, 2014
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 434K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Genecov G-6-185566 | Beckville, West (Cotton Valley) | XTO Energy Inc. | 1 | 0 | 434K | Jul 2001 – Jul 2026 |
Gas, mcf lease total
Last 12 months 2,195 · prior 12 3,828(-43%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pedeco, Inc.Jul 2001 → Oct 2002
- 2Classic Oil & Gas, Inc.Nov 2002 → Jan 2004
- 3XTO Energy Inc.Feb 2004 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 780416-99 | Recompletion | XTO Energy Inc. | Feb 21, 2014 | Mar 28, 2014 | — | 10,330 |
| 507215-96 | Drill | Pedeco, Inc. | Oct 29, 2001 | Mar 30, 2001 | Apr 17, 2001 | 11,000 |
| 507215-97 | Drill | Pedeco, Inc. | Oct 18, 2001 | Mar 30, 2001 | — | 11,000 |
| 507215-99 | Drill | Pedeco, Inc. | Mar 30, 2001 | Mar 30, 2001 | — | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-185566 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 229 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cotton ValleyUPPER COTTON VALLEY | 9,054 | -8,825 |
| TaylorTOP TAYLOR SD | 9,948 | -9,719 |
| BossierTOP BOSSIER SHALE | 10,220 | -9,991 |
| Limestone Marker | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,964 | 10,208 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,006 | 12.25 | 980 S |
| 5.5 | 10,330 | 7.875 | 1,190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 6, 2001 | Aug 31, 2001 | Yes |
| 00 | Nov 26, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34654 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34654 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000109986 | H-1 Injection | Not activated | 10,000 | 3,400 | 6,800–8,500 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36534654, documented in the API reference.