WELL · 42-365-34834 · DISTRICT 6
Brumble G. W. #1
Panola County · Bethany (Blossom) field · Producing · Vertical
Brumble G. W. #1 (API 42-365-34834) is a well in Panola County operated by Elms Oil Company, completed May 20, 2002 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued April 16, 2002, permitted to 2,100 ft.
It was permitted by Endurance Oil & Gas, Inc. and has since transferred to Elms Oil Company on the wellbore schedule.
Completion filings report 2 formation tops, including Nacatosh, Blossom.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Endurance Oil & Gas, Inc.; the EWA schedule now lists a different operator.
Kilgore, TX · P-5 Y, filed Aug 4, 2025 · 1 permits on file · (903) 841-8402
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Elms Oil Company |
| Production reports | Elms Oil Companythrough Apr 2026 |
| Latest permit | Endurance Oil & Gas, Inc.Apr 16, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,100
- total depth, ft
- 1
- permits on file
- Apr 16, 2002
- last permit issued
- May 20, 2002
- completed
- 0
- cumulative oil, bbl
- 171K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 20, 2002
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brumble, G. W. G-6-189500 | Bethany (Blossom) | Elms Oil Company | 1 | 0 | 171K | May 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,052 · prior 12 6,873(-12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Endurance Oil & Gas, Inc.Oct 2002 → Apr 2023
- 2Brangus Energy LLCMay 2023 → Aug 2025
- 3Elms Oil CompanyOct 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 519025-99 | Drill | Endurance Oil & Gas, Inc. | Apr 11, 2002 | Apr 16, 2002 | Apr 29, 2002 | 2,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-189500 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 347 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nacatosh | 974 | -627 |
| Blossom | 1,950 | -1,603 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,946 | 1,956 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 2,084 | 6.75 | 229 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 16, 2002 | Jun 19, 2002 | Yes |
| 00 | Jul 26, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34834 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34834 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36534834, documented in the API reference.