WELL · 42-365-35241 · DISTRICT 6

Gulley Marvin #19

N

Panola County · Bethany (Travis Peak 6100) field  · Vertical

Gulley Marvin #19 (API 42-365-35241) is a permitted well in Panola County filed by Total E&P USA, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits in 2004, permitted to 10,000 ft.

Completion filings report 5 formation tops, including Massive Anhydrite (marker), James Lime, Pine Island, Travis Peak.

Its 3 leases have reported 39.5K barrels of oil and 773K mcf of gas since April 2004, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Total E&P USA Inc.

Houston, TX · P-5 Y, filed Jun 2, 2017 · 74 permits on file · (281) 382-3534

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTotal E&P USA Inc.
Production reportsXTO Energy Inc.through Aug 2019
Latest permitTotal E&P USA, Inc.Dec 14, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Dec 14, 2004
last permit issued
—
completed
39.5K
cumulative oil, bbl
773K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gulley, Marvin G-6-202991Bethany, East (Cotton Valley)XTO Energy Inc.10498KApr 2004 – Jul 2026
Gulley, Marvin O-6-14382Bethany (Werner)XTO Energy Inc.139.5K275KDec 2004 – Jul 2026
Gulley, Marvin G-6-204808Bethany (Travis Peak 6100)Total E&P USA, Inc.10225Jul 2004 – Dec 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Total E&P USA, Inc.Apr 2004 → Feb 2006
  2. 2XTO Energy Inc.Mar 2006 → Aug 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
554831-99RecompletionTotal E&P USA, Inc.Dec 14, 2004Dec 14, 2004—10,000
540772-99DrillTotal E&P USA, Inc.Jan 14, 2004Jan 14, 2004Feb 24, 200410,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-202991————
—— G-6-204808————
—— O-6-14382————

Formation tops

As filed on W-2/G-1. Subsea from 293 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE4,715-4,422
James Lime5,230-4,937
Pine Island5,413-5,120
Travis PeakTOP TRAVIS PEAK5,887-5,594
Travis PeakBASE TRAVIS PEAK7,977-7,684
Base B Lime8,249-7,956

Perforations

Perforated and open-hole intervals.

FromToType
5,8965,906Perforated
8,3388,345Perforated
8,3928,402Perforated
8,6108,620Perforated
8,6508,655Perforated
9,0729,076Perforated
9,1209,128Perforated
9,1389,143Perforated
9,4429,454Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,50312.25453 S
2.8759,7106.51,900 S
2.8759,710——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 24, 2005Jan 5, 2005Yes
00Apr 29, 2005——
00Mar 7, 2005Oct 19, 2004—
00Dec 27, 2004——
00Sep 30, 2004Jun 9, 2004Yes
00Aug 26, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36535241, documented in the API reference.