WELL · 42-365-35370 · DISTRICT 6

Panola Development #8

Plugged

Panola County · Carthage (6900) field  · Vertical

Panola Development #8 (API 42-365-35370) is a plugged well in Panola County, plugged February 7, 2017, last operated by Glassell Producing Company Inc..

The RRC has issued 3 drilling permits between 2004 and 2009, permitted to 10,000 ft.

Completion filings report 8 formation tops, including Hill, Gloyd, Pettit, Travis Peak.

Operator of record

Glassell Producing Company Inc.

Houston, TX · P-5 Y, filed Feb 4, 2026 · 48 permits on file · (713) 652-3103

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGlassell Producing Company Inc.
Production reportsGlassell Producing Company, Inc.through Sep 2016
Latest permitGlassell Producing Company, Inc.Sep 9, 2009
10,000
total depth, ft
3
permits on file
Sep 9, 2009
last permit issued
Nov 28, 2008
completed
0
cumulative oil, bbl
740K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2005 THROUGH Feb 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 28, 2008
Shut in
—
Plugged
Feb 7, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Panola Development Company G-6-256436Carthage (Travis Peak 6450)Glassell Producing Company, Inc.10460KMay 2010 – Feb 2017
Panola Development G-6-243556Carthage (6900)Glassell Producing Company, Inc.1043.4KNov 2008 – May 2010
Panola Development Company G-6-208342Carthage (Cotton Valley)Glassell Producing Company, Inc.10237KJan 2005 – Nov 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Glassell, Alfred C., Jr.Jan 2005 → Apr 2007
  2. 2Glassell Producing Company, Inc.May 2007 → Sep 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
681944-99RecompletionGlassell Producing Company, Inc.Jun 8, 2009Sep 9, 2009May 4, 20106,800
676441-99RecompletionGlassell Producing Company, Inc.Dec 16, 2008Dec 22, 2008Nov 14, 20089,676
546881-99DrillGlassell, Alfred C., Jr.Jun 14, 2004Jun 16, 2004Oct 31, 200410,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-208342————
—— G-6-243556————
—— G-6-256436————

Formation tops

As filed on W-2/G-1. Subsea from 291 ft elevation.Download CSV →

FormationMD ftSubsea
Hill4,991-4,700
Hill4,992-4,701
Gloyd5,040-4,749
Pettit5,759-5,468
PettitUPPER PETTET5,759-5,468
PettitUPPER PETTIT5,759-5,468
Travis Peak6,068-5,777
Travis PeakTRAVIS PEAK MKR.6,068-5,777
Travis Pek6,068-5,777
Cotton Valley8,180-7,889
Sexton9,668-9,377
Sexton/Taylor9,668-9,377

Perforations

Perforated and open-hole intervals.

FromToType
6,3146,318Perforated
6,8216,829Perforated
8,4738,622Perforated
9,0019,293Perforated
9,3029,308Perforated
9,3149,318Perforated
9,3769,668Perforated
9,6729,686Perforated
9,6969,702Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,30011400 S
4.59,8507.8751,975 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 12, 2017Nov 9, 2016—
00Aug 2, 2010Jun 11, 2010Yes
00Jul 6, 2010——
00Feb 5, 2009Dec 28, 2009Yes
00Jan 7, 2009——
00Jun 1, 2006Dec 12, 2005—
00Jul 25, 2005Mar 10, 2005Yes
00May 24, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36535370, documented in the API reference.