WELL · 42-365-35442 · DISTRICT 6
Hebert #16
Panola County · Directional
Hebert #16 (API 42-365-35442) is a permitted well in Panola County filed by Devon Louisiana Corporation; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 2004 and 2005, permitted to 10,000 ft.
Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.
Operator of record
Houston, TX · P-5 Y, filed Mar 7, 2008 · 361 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Sheridan Production Co III, LLCthrough Apr 2026 |
| Latest permit | Devon Louisiana CorporationJul 15, 2005 |
- 10,000
- total depth, ft
- 3
- permits on file
- Jul 15, 2005
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.76M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hebert G-6-216003 | Carthage (Cotton Valley) | Diversified Production LLC | 1 | 0 | 1.76M | Feb 2005 – Jul 2026 |
Gas, mcf lease total
Last 12 months 18,358 · prior 12 19,972(-8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Devon Energy Production Co, L.P.Feb 2005 → Jun 2016
- 2Sheridan Production Company, LLCJul 2016 → Dec 2019
- 3Sheridan Production Co III, LLCJan 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603507-99 | Drill | Devon Louisiana Corporation | Jul 15, 2005 | Jul 15, 2005 | — | 10,000 |
| 548915-98 | Drill | Devon Louisiana Corporation | Jul 15, 2005 | Aug 3, 2004 | — | 10,000 |
| 548915-99 | Drill | Devon Louisiana Corporation | Jul 29, 2004 | Aug 3, 2004 | Jan 7, 2005 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-216003 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 325 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 5,908 | -5,583 |
| Pettit | 5,910 | -5,585 |
| Travis Peak | 6,308 | -5,983 |
| Travis Peak | 6,310 | -5,985 |
| Cotton Valley | 8,320 | -7,995 |
| Cotton Valley | 8,338 | -8,013 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,495 | 9,436 | Perforated |
| 8,898 | 9,436 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,023 | 12.25 | 380 S |
| 5.5 | 9,675 | 7.875 | 1,460 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 2012 | Jul 14, 2011 | — |
| 00 | Sep 20, 2006 | Apr 4, 2005 | Yes |
| 00 | May 24, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-35442 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-35442 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36535442, documented in the API reference.