WELL · 42-365-35640 · DISTRICT 6

Txu Simmons #1

Y

Panola County · Beckville (Cotton Valley) field · Producing  · Directional

Txu Simmons #1 (API 42-365-35640) is a well in Panola County operated by Xto Energy Inc., completed June 9, 2005 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 25, 2005, permitted to 10,500 ft.

It was permitted by Pxp Texas Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Travis Peak, Base B Lime, Taylor.

No lease production has been reported under this well’s leases.

Operator of record

XTO Energy Inc.

Permitted by PXP Texas Inc.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitPXP Texas Inc.Jan 25, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Jan 25, 2005
last permit issued
Jun 9, 2005
completed
0
cumulative oil, bbl
1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 9, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Txu Simmons G-6-224740Beckville (Cotton Valley)XTO Energy Inc.101MJun 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 9,496 · prior 12 15,532(-39%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jun 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
556779-98DrillPXP Texas Inc.Feb 17, 2005Jan 25, 2005Mar 5, 200510,500
556779-99DrillPXP Texas Inc.Jan 26, 2005Jan 25, 2005—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-224740————

Formation tops

As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →

FormationMD ftSubsea
Travis Peak7,344-6,966
Base B Lime9,405-9,027
TaylorTAYLOR SAND10,456-10,078

Perforations

Perforated and open-hole intervals.

FromToType
9,69410,592Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,29114.51,024 S
9.6257,13812.25610 S
4.510,72461,046 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 30, 2007Oct 3, 2005Yes
00Feb 23, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36535640, documented in the API reference.