WELL · 42-365-36291 · DISTRICT 6

Yellow Dog Gas Unit #2

Y

Panola County · Joaquin (Wiener) field · SWR-10-Well  · Directional

Yellow Dog Gas Unit #2 (API 42-365-36291) is a well in Panola County operated by Will-Drill Operating L.L.C., completed August 26, 2008 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued July 13, 2006, permitted to 9,700 ft.

It was permitted by Will-Drill Production CO., Inc. and has since transferred to Will-Drill Operating L.L.C. on the wellbore schedule.

Completion filings report 6 formation tops, including Tma, BMA, James Lime, Sligo.

No lease production has been reported under this well’s leases.

Operator of record

Will-Drill Operating L.L.C.

Permitted by Will-Drill Production Co., Inc.; the EWA schedule now lists a different operator.

Shreveport, LA · P-5 Y, filed Oct 4, 2025 · 4 permits on file · (318) 222-7464

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWill-Drill Operating L.L.C.
Production reportsWill-Drill Operating, L.L.C.through Aug 2015
Latest permitWill-Drill Production Co., Inc.Jul 13, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,700
total depth, ft
1
permits on file
Jul 13, 2006
last permit issued
Aug 26, 2008
completed
0
cumulative oil, bbl
1.19M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 26, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Yellow Dog Gas Unit G-6-222950Carthage (Cotton Valley)Will-Drill Operating, L.L.C.101.19MAug 2006 – Jul 2026
Yellow Dog Gas Unit G-6-239166Joaquin (Wiener)Will-Drill Operating, L.L.C.100Aug 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Will-Drill Production Co., Inc.Aug 2006 → Dec 2008
  2. 2Will-Drill Operating, L.L.C.Jan 2009 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
622531-99DrillWill-Drill Production Co., Inc.Jul 13, 2006Jul 13, 2006Jul 20, 20069,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-222950————
—— G-6-239166————

Formation tops

As filed on W-2/G-1. Subsea from 183 ft elevation.Download CSV →

FormationMD ftSubsea
Tma4,750-4,567
BMA4,967-4,784
James Lime5,500-5,317
Sligo5,814-5,631
Travis Peak6,400-6,217
Cotton Valley8,610-8,427

Perforations

Perforated and open-hole intervals.

FromToType
6,4936,635Perforated
6,4938,262Perforated
7,3077,414Perforated
7,9478,262Perforated
9,2269,557Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37548617.5470 S
9.6253,30212.251,190 S
4.59,7907.8751,240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 3, 2008Sep 18, 2008—
00Sep 25, 2008——
00Apr 9, 2007Nov 3, 2006Yes
00Dec 8, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36536291, documented in the API reference.